BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 1, 2025 at 7:00 PM

Updated December 2, 2025

Site work for a water / sewer project in Port St Lucie, Florida. Working plans call for site work for a water / sewer project.

Well Abandonment McCarty Extension A. The Work to be performed under this Section includes the furnishing of all labor, materials, equipment, and all other facilities and incidentals necessary to abandon one (1) flowing well located in Area 2 of the McCarty Ranch Extension property in St. Lucie County, Florida with approximate construction specifications and location as summarized below. Well ID Area 2 - Unknown Estimated Casing Depth (feet) ~400 Estimated Total Depth (feet) ~1,000 Final Well Casing Diameter (inches) 10 B. The proposed well shall be abandoned to standards as described by the South Florida Water Management District (SFWMD) and the Florida Department of Environmental Protection (FDEP) rules and regulations, and shall comply with any other applicable federal, state, and local rules and regulations. C. The potentiometric surface of the Floridan aquifer is expected to be about 15 to 20 feet above land surface at the site, therefore, flowing well conditions are to be expected and compensated to allow for the planned testing and well abandonment. D. The Contractor shall establish his work sequence based on the use of crews to facilitate completion within the allotted Contract time. E. A video log will be performed by the Contractor on the well prior to abandonment with a color video camera with downhole and 360 directional side viewing capability. F. If there are any partial obstructions noted in the well, they shall be cleared by the Contractor prior to well abandonment as approved by the SFWMD. Drilling out of fill material shall continue until the Contractor begins drilling new limestone formation in the borehole. G. A series of geophysical logs will be performed by the Contractor on the well after clearing of the open borehole and prior to abandonment. The geophysical logs will include caliper and natural gamma ray. H. If clearing is required, a second video log will be performed by the Contractor on the well after clearing of the open hole and prior to abandonment with a color video camera with downhole and 360 directional side viewing capability. I. Location of all existing utilities will be the Contractor's responsibility. Damage to any utilities shall be repaired at the Contractor's expense. J. These Specifications are intended to be a general description of the required work but may not cover all contingencies that may occur during well abandonment. Changes or variations from the work plan shall be approved by the Hydrogeologist, prior to execution.

Final Planning

Water / Sewer

$100,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
94
Bidding Soon
1,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 19, 2025

December 2, 2025

Project location map

12525 Range Line Rd, Port St Lucie, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.