BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2025 at 8:00 PM

Updated July 29, 2025

Site work for a water / sewer project in Asheville, North Carolina. Completed plans call for site work for a water / sewer project.

Description: The Project includes the following Work: Contract #01: Sanitary Sewer System Rehabilitation Rehabilitation of approximately 12,419 LF of gravity sewer pipe by CIPP, pipe bursting, or open-cut methods. Rehabilitation by lining, of approximately 70 manholes and the wet well for the South Main Lift Station. Work includes all one calls, pipe lining, lateral grouting, all bypass pumping, temporary traffic control, and all other associated work. Contract #02: Television Inspection, Smoke Testing of Sewers, and Flow Meter Installations Television inspection and smoke testing of approximately 99,174 LF of gravity sewer and 372 manholes. Work will include all CCTV, all one calls, bypass pumping, root / debris removal as necessary, temporary traffic control, installation of up to ten (10) area-velocity meters for open channel flow (in a permanent configuration) along with rain gauges and any other associated work. Contract #03: Television Inspection, Smoke Testing of Sewers, and Flow Meter Installations Television inspection and smoke testing of approximately 64,562 LF of gravity sewer and 319 manholes. Work will include all CCTV, all one calls, bypass pumping, root / debris removal as necessary, temporary traffic control, installation of up to ten (10) area-velocity meters for open channel flow (in a permanent configuration) along with rain gauges and any other associated work. The Project has an expected duration of: Contract #1: 120 days for Substantial Completion / 150 days for Final Completion Contract #2: 120 days for Substantial Completion / 150 days for Final Completion Contract #3: 120 days for Substantial Completion / 150 days for Final Completion Note: The Notice to Proceed for all contracts is expected to be before July 1, 2025 Questions Will be taken until the end of the day on May 27, 2025, EDT. Please send questions to norma.george-ferrara@mcgillassociates.com. Est. Value Notes: Estimate is for all three contracts. Pre-Bid Meeting Info: A Pre-Bid Meeting will NOT be held. Custom Bid Results Contract 1 Norris Brothers Excavating - 163,516.00 Contract 2 Norris Brothers Excavating - 231,842.50 Contract 3 Norris Brothers Excavating - 231,842.50

Bid Results

Water / Sewer

$627,201.00

Public - City

Site Work

44

22

6

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
116
Bidding Soon
1,317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 1, 2025

Project location map

To Be Determined, Asheville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.