Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2025 at 8:00 PM
Updated July 3, 2025
Site work for a water / sewer project in Newkirk, Oklahoma. Completed plans call for site work for a water / sewer project.
Quantity Unit Description 1180.00 L.F. 6 PVC C900 DR18 Water Main 237.00 L.F. Install 12 Steel Casing, 0.188 thick 2.00 Ea. 2 Sch. 40 Vent Pipe 1.00 Ea. 4 Interconnection 1.00 Ea. 4 Gate Valve & Box 1.00 Ea. 4 x90 Bend 2.00 Ea. 4 x4 Tapping Sleeve & Valve 2.00 Ea. 6 x4 Reducer 1.00 Ea. 6 x6 x4 Tee 3.00 Ea. 6 x6 x6 Tee 1.00 Ea. 6 x90 Bend 7.00 Ea. 6 x45 Bend 4.00 Ea. 6 Gate Valve & Box 2.00 Ea. 6 Fire Hydrant 1.00 Ea. 10 x6 Tapping Sleeve & Valve 1.00 Ea. 1 Combination Air Valve 1.00 Ea. 2 Blowoff Assembly 309.00 S.Y. Gravel Repair 1.00 L.S. Erosion Control 1.00 L.S. Hydrostatic Pressure Testing and Disinfection A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Work fully complete the project within 60 consecutive calendar days. Bidder further agrees to pay $1500.00 as liquidated damages for each consecutive calendar day thereafter completion
Award
Water / Sewer
$195,212.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
July 14, 2025
S Plum Ave, Newkirk, OK
Related To This Project
Newkirk, OK
Bid Date: Jun 13 2025
Newkirk, OK
Bid Date: Jul 01 2025
Newkirk, OK
Bid Date: Oct 14 2025
Newkirk, OK
Bid Date: Oct 27 2025
Newkirk, OK
Bid Date: Dec 01 2025
Newkirk, OK
Bid Date: Dec 19 2025
Newkirk, OK
Bid Date: Jun 02 2025
Newkirk, OK
Bid Date: Jun 24 2025
Newkirk, OK
Bid Date: Jun 12 2025
Newkirk, OK
Bid Date: Apr 28 2025
Newkirk, OK
Bid Date: Feb 21 2025
Newkirk, OK
Bid Date: Feb 13 2025
Newkirk, OK
Bid Date: Feb 13 2025
Newkirk, OK
Bid Date: Sep 14 2021
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.