BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 14, 2025 at 8:00 PM

Updated June 15, 2025

This is a service / maintenance or supply contract in Brunswick, Georgia. Contact the soliciting agency for additional information.

The JWSC has been successful at eliminating many of the capacity roadblocks outlined in previous plans and now wishes to focus on future planning efforts. The community has experienced significant growth since the most recent update. The JWSC wishes to update its plan to allow for a holistic planning approach for the future infrastructure needs of the City of Brunswick and Glynn County, by utilizing up-to-date population projects from the City of Brunswick and Glynn County. The JWSC anticipates awarding a contract to the successful proposer no later than July 19, 2025, with contract to start no later than September 1, 2025. The selected firm is to complete all identified tasks within 270 days of receiving a signed notice to proceed. The selected Consultant must be capable of performing the following tasks and delivering the following on behalf of the JWSC: Task 1 - Available Data Review and Evaluation - The selected firm should review the existing Water and Sewer Master Plan, the utility's geographical information system (GIS) mapping, available Bentley WaterGEMS model, the utility's computerized maintenance management system (CMMS), the 2023 City of Brunswick Comprehensive Plan, and the 2023 Glynn County Comprehensive Plan in order to determine additional data needs to facilitate the master plan update. Task 2 - Water and Sewer Flow Projections - The selected firm should utilize available information to project water and sewer flow requirements for at least 20 years These flow projections should include water and sewer usage trends for the utility's customer and population projections provided in the Glynn County Comprehensive Plan. For water flow projections, the JWSC requests the projections be organized by geographic areas to include the City of Brunswick, North Mainland, South Mainland, and St. Simons Island. For sewer flow projections, the JWSC requests the projections be organized by sewer pump station service basins. Flow projections should be identified for each year included in the planning period. For future development flow projections, interviews should be conducted with the City of Brunswick Planning & Zoning Department and the Glynn County Community Development Department to determine the proposed rate and schedule of development in the different areas. Task 3 - Major Asset Condition Assessment - The most recent Water and Sewer Master Plan includes a condition assessment of major water and sewer facilities that are likely to still be mostly accurate. JWSC staff will provide a list of improvements made since the creation of the most recent Water and Sewer Master Plan for review of the condition assessments. The selected firm should determine which JWSC assets that are not included in the most recent update's condition assessment need an updated condition assessment due to either a likely change in the condition assessment or due to changes in the asset criticality. Task 4 - Water and Sewer Rehabilitation Plan - The selected firm should develop a water and sewer rehabilitation plan for at least 20 years based upon the utility's consequence of failure and probability of failure criteria. Each listed project should include a proposed scope of work and detailed cost estimate. Task 5 - Water and Sewer Expansion Plan - The selected firm should develop a water and sewer expansion plan for at least 20 years based upon the City of Brunswick Comprehensive Plan and the Glynn County Comprehensive Plan. The prioritization of extensions into existing neighborhoods located within the JWSC service area that are without JWSC water and/or sewer service is expected. Each listed project should include a proposed scope of work and a detailed cost estimate. Task 6 - Cash Flow Needs Forecast - The selected firm should determine projected annual cash flow needs based upon the plans developed in Tasks 4 and 5. The projects should be ordered based upon risk to the utility, while allowing for cash flow smoothing when possible. This should be completed separately for the Water and Sewer Rehabilitation Plan and Water and Sewer Expansion Plan. Task 7 - Presentation of the Water and Sewer Master Plan - The selected firm should present a draft updated Water and Sewer Master Plan to staff for review and consideration. Following the review of comments provided by staff, the selected firm should present a draft updated Water and Sewer Master Plan to the JWSC Facilities Committee for review and consideration. Questions regarding this solicitation shall be made in writing to the Purchasing Director, Pam Crosby, via email: pcrosby@bgjwsc.org on or before 5:00 p.m. EST on Friday, June 13, 2025. The final scope of services will be subject to negotiation. The proposal should include a detailed scope of services and all costs for which the consultant expects to be compensated for, including all materials furnished and services provided. The quoted price shall constitute full and complete compensation for the services and materials as outlined within this solicitation. Consultant staff fee schedule should clearly indicate effective dates, applicable escalation clauses, and miscellaneous billable costs, in addition to hourly rates. As the JWSC is committed to making the most efficient use of rate payer funds available, the comparative cost factors associated with each proposal will also be considered. The JWSC reserves the right to select the best combination of qualifications and cost effectiveness for the scope of work identified in this RFP. Upon receipt of the proposals, the Selection Committee will score each firm based on the criteria outlined in Section 6.0. of the solicitation. The rating system will consist of a numerical grading system, as set forth in Section 6. The highest scoring proposal will be recommended to the BGJWSC Commission for final approval. The BGJWSC reserves the right to reject any and all proposals, waive technicalities and make an award in the best interest of the BGJWSC.

Conceptual

Water / Sewer

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
63
Bidding Soon
865
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2025

Project location map

1703 Gloucester Street, Brunswick, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.