Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 7, 2025 at 8:00 PM
Updated July 8, 2025
Site work for a water / sewer project in Riverton, California. Completed plans call for site work for a water / sewer project.
The work to be performed consists of: Drilling and installation of fiberglass long-screened test wells at two (2) sites up to 800 feet deep, including site preparation, drilling, well construction, gravel packing, development, waste handling, permit acquisition, noise mitigation, and traffic control. Question Deadline 06/18/2025 at 5:00 PM PT Questions or comments regarding this Project must be submitted electronically and must be received by the District Questions received after the date indicated will not be accepted. Questions submitted via telephone call, email or faxes will not be accepted. Responses from the District will be communicated via electronically . The site of the work is located on DISTRICT property (APN 31-313-016), within an established residential neighborhood, at 942 Tanglewood Dr., in the City of South Lake Tahoe, in the County of El Dorado, California. A portion of the work is also located on DISTRICT property (APN 80-112-002), within an established residential neighborhood, at 2438 Cattlemans Trail, in the City of South Lake Tahoe, in the County of El Dorado, California. After electronic bidding, each bidder shall submit their original Bid Forms to South Tahoe Public Utility District at 1275 Meadow Crest Drive, South Lake Tahoe, California by 2 p.m. on June 26, 2025. In accordance with the provisions of California Public Contract Code section 3300, the South Tahoe Public Utility District has determined that bidders shall possess a valid class C57 contractor license at the time of bid opening, the Contract is awarded and for the duration of the Contract. Failure to possess the specified license shall render the bid as non-responsive and shall act as a bar to awarding the contract to any bidder not possessing said license at the time of award. Bids shall be valid for 60 calendar days after the bid opening date, as required in the Bid Form. In addition, for timely completion of the Project, the District requires that the Contractor meet intermediate contract deadlines to assure that the Project proceeds on schedule. 1. Intermediate Milestone 1: Construction of the Tanglewood Well shall be complete and ready for testing prior to September 15, 2025. 2. Intermediate Milestone 2: Construction of the Cattlemans Well shall be complete and ready for testing prior to October 15, 2025 Bid date description: All bids that have been timely received will be publicly opened and the content read aloud at the STPUD offices, Board Room, located at 1275 Meadow Crest Drive, South Lake Tahoe, California.
Award
Water / Sewer
$1,475,452.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2025
August 7, 2025
Multiple Locations, Riverton, CA
Related To This Project
Riverton, CA
Bid Date: Jun 19 2025
Riverton, CA
Bid Date: Sep 25 2025
Riverton, CA
Bid Date: Jun 20 2025
Riverton, CA
--
Riverton, CA
Bid Date: May 08 2025
Riverton, CA
Bid Date: Apr 17 2025
Riverton, CA
Bid Date: Aug 14 2024
Riverton, CA
Bid Date: May 07 2024
Riverton, CA
--
Riverton, CA
Bid Date: Feb 03 2022
Riverton, CA
Bid Date: Mar 15 2022
Riverton, CA
Bid Date: Jan 06 2022
Riverton, CA
Bid Date: Aug 24 2023
Riverton, CA
Bid Date: Jun 27 2023
Riverton, CA
Bid Date: Jun 29 2023
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
