Published July 8, 2025 at 8:00 PM
Updated July 9, 2025
Site work and paving for a road / highway in Sacramento, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Kiefer Boulevard Phase 2A Shoulder Improvements The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and other incidental work for: pavement widening at the south corner of the intersection of Kiefer Boulevard and Grant Line Road. The work to be performed in general includes sawcut of existing pavement, excavation, placing and compacting new aggregate base, placing and compacting new asphalt pavement, relocating a stop sign, and extending the stop bar pavement marking Each bid must be submitted on the bid forms provided in the Contract Documents; however, if none are provided, the surety may issue on its own paper. Each bid must also be accompanied by security in the form of a bid bond issued by a corporate surety, a certified check or cashier's check payable to the Treasurer of Sacramento County, or cash for an amount not less than ten percent (10%) of the aggregate sum of the bid. The successful bidder shall be required to execute a material and labor Payment Bond and Performance Bond, issued by a corporate surety, acceptable to the County of Sacramento, each for not less than one hundred percent (100%) of the contract price. Award of this contract requires a valid California contractor's license with the classification identified above. Public Contract Code, section 4104(a)(1), requires that any person making a bid must submit the name, location of the place of business, and the subcontractor's license number on the bid form. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code, section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. The County of Sacramento reserves the right to reject any or all bids, to waive any informality in any bid, and to determine which bid, in their judgment, is the lowest responsive bid of a responsible Bidder. Question Deadline 06/06/2025 at 5:00 PM PT Direct pre-bid questions to the Project Manager, Anthony Pasek, via the Q&A tab in the portal. ALL PREBID QUESTIONS MUST BE SUBMITTED IN WRITING Questions received after that time will not be answered. Responses will be by addenda to the bid documents.
Award
Roads / Highways
$104,564.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2025
July 28, 2025
Kiefer Blvd, Sacramento, CA
Related To This Project
Sacramento, CA
Bid Date: Jun 04 2025
Sacramento, CA
Bid Date: May 28 2025
Sacramento, CA
--
Sacramento, CA
Bid Date: May 28 2025
Sacramento, CA
Bid Date: Jun 17 2025
Sacramento, CA
Bid Date: Jun 11 2025
Sacramento, CA
Bid Date: May 30 2025
Sacramento, CA
Bid Date: Jun 10 2025
Sacramento, CA
Bid Date: Jun 04 2025
Sacramento, CA
Bid Date: Jun 04 2025
Sacramento, CA
Bid Date: Jun 04 2025
Sacramento, CA
Bid Date: May 28 2025
Sacramento, CA
Bid Date: May 28 2025
Sacramento, CA
Bid Date: Jun 12 2025
Sacramento, CA
Bid Date: Jun 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.