BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 28, 2025 at 8:00 PM

Updated June 6, 2025

Site work and paving for a sidewalk / parking lot in Winthrop, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk Replacement Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. There is no pre-bid conference scheduled for this project. Any questions regarding this bid should be directed to the Department of Public Works @ (617) 846-1341. Question Deadline 05/29/2025 By bidding on this project each Bidder certifies its intent to comply with the Massachusetts Minority/Women Business Enterprise Plan to further expand business opportunities for minority firms 3.2 The awarded bidder shall, prior to the award of any sub-contract, obtain from each of its sub-contractors the SubContractors Certification certifying the Sub-Contractor shall comply with the minority manpower ratio. SUMMARY OF WORK A. The Work under the Contract consists of: 1. The removal and re-construction of approximately 2,500 square yards of cement concrete sidewalks and approximately 500 square yards of concrete driveway aprons / Pedestrian ramps including curb resetting, adjustment of sidewalk structures such as utility shut offs, loam and asphalt patching, where necessary. This work may also the construction of new handicap ramps and curb cuts to exact tolerances and the restoration of private properties as required. All work shall consist of furnishing any and all materials, labor, and equipment, to complete the work in accordance with the specific requirements of this Project Manual. B. In addition, the work under the contract includes: 1. The restoration of any items damaged or destroyed by encroaching upon areas outside the Project Site. 2. Sealing of all newly poured cement 3. All labor, materials, tools, and equipment necessary to do all the work required for the completion of each item as specified, which shall be limited not only to the exact intent mentioned, but shall include incidental work necessary or customarily performed for the completion of that item. 4. All items not specifically mentioned or noted in the Project Manual and/or Plan(s), but which are obviously necessary to make a complete working installation.

Post-Bid

Sidewalks / Parking Lot

$260,500.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
505
Active Projects
105
Bidding Soon
3,827
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

Multiple Locations, Winthrop, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.