BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2025 at 8:00 PM

Updated July 4, 2025

Renovation of a water / sewer project in Arlington, Texas. Completed plans call for the renovation of a water / sewer project.

The intent of this solicitation is to hire a vendor to complete Filter and Backwash Improvements for the Pierce-Burch Water Treatment Plant following the specifications. The City of Arlington strongly encourages bidders to submit their response to this bid electronically. If submitting a paper bid, it must be submitted in a sealed envelope or package and labeled with the company name, solicitation number and title. Late bids will not be accepted. The City of Arlington exclusively uses IonWave for the notification and dissemination of all solicitations. The receipt of solicitations through any other means may result in your receipt of incomplete specifications and/or addendums which could ultimately render your bid/proposal non-compliant. The City of Arlington accepts no responsibility for the receipt and/or notification of solicitations through any other means. The intent of this solicitation is to hire a vendor to complete Filter and Backwash Improvements for the Pierce-Burch Water Treatment Plant following the specifications. Question Cut Off Date 6/12/2025 06:00:00 PM (CT) A Contract Specific Goal of 30 % of the Contract Price, less Owner's Contingency Allowance and Extra Work item amounts, has been set for this project. All Offerors are required to utilize certified MWBE companies and/or persons for a minimum of 30% of the Contract Price, less Owner's Contingency Allowance and Extra Work item amounts. With the adoption of a MWBE Program, all proposals will be reviewed to see whether said Offeror(s) has met the requirements of the City's MWBE program. The Project includes the following Work: The Project Work consist of rehabilitation and replacement of filter equipment and appurtenances at the needs at the Pierce-Burch Water Treatment Plant filters. The scope of work includes the underdrain replacement for twenty (20) filters, addition of filter-to-waste piping, relocation of air scour piping, replacement of influent and effluent piping, replacement of valves and actuators, and miscellaneous piping and site improvements. The Budget for the Project is $35-37M. The Project is to be substantially complete and ready for operation on or before September 1, 2027. The Project is to be complete and eligible for final payment 60 days after the date for Substantial Completion.

Bid Results

Water / Sewer

$54,170,500.00

Public - City

Renovation

228

48

4

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
371
Active Projects
176
Bidding Soon
3,768
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

September 1, 2025

Project location map

1901 Lakewood Dr, Arlington, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.