Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 27, 2025 at 8:00 PM
Updated June 28, 2025
Site work and paving for a sidewalk / parking lot in Danville, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Board of Trustees of Community College District No. 507 (Danville Area Community College) desires to receive sealed bids for a New Sidewalk. Danville Area Community College (DACC) is seeking bids from qualified contractors for the installation of approximately 250 linear feet of new sidewalk on campus. This project will connect the Bremer Conference Center to Jacobs Hall and the adjacent parking lot. The successful bidder will be responsible for furnishing all labor, materials, equipment, and services necessary to complete the installation of the new sidewalk in accordance with DACC specifications and applicable codes. If you have any questions regarding the bid process, please contact Carl Lewis at 217-443-8881, or email c.lewis@dacc.edu Questions regarding the bid specifications, please contact Doug Adams at 217-443-8832 or email d.adams@dacc.edu . A. Grading and Drainage Where drainage crosses the sidewalk, the surface shall be uniformly pitched at 1/4 inch per foot from high to low side. o Where the longitudinal slope exceeds 2%, the cross-pitch may be reduced to 1/8 inch per foot. o Crowned walks are allowed only ifthe longitudinal slope is at least 2% and there is no cross-drainage. o Sub-grade must be compacted prior to placement ofreinforcing or concrete. Where fill is required, use crushed rock or road pack. B. Sidewalk Construction Walks shall be at least 4 inches thick, 5 feet wide. o Reinforce with #6 WWF or epoxy-coated rebar at 24" o.c. o At expansionjoints, provide 18-inch rebar at 24" centers. o No less than 3500 - 4000 PSI concrete mix. C. Intersections and Junctions Provide generous fillet curves at walk intersections. o At junctions with existing sidewalks, fillet curve terminations shall be 12 inches wide and reinforced to prevent cracking. o Reinforce all walk intersections and junctions to prevent "ear" breakage. D. Finishing All sidewalks shall receive a stiff broom finish. o Joints shall be hand-tooled with control joints spaced evenly approximately every 5 linear feet. Question Deadline 06/04/2025 DISCREPANCIES discovered by a bidder, or omissions from the Documents, or should the bidder be in doubt as to the meaning of any requirement on the Documents, the bidder shall at once notify the Assistant Vice President of Finance in writing, but in no event later than five (5) days prior to the date for receiving bids
Award
Sidewalks / Parking Lot
$22,617.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 11, 2025
July 1, 2025
2000 E Main St, Danville, IL
Related To This Project
Danville, IL
Bid Date: Jun 25 2025
Danville, IL
--
Danville, IL
--
Danville, IL
Bid Date: Jun 17 2025
Danville, IL
Bid Date: Jun 25 2025
Danville, IL
Bid Date: Aug 12 2025
Danville, IL
Bid Date: Jul 29 2025
Danville, IL
Bid Date: Jul 14 2025
Danville, IL
Bid Date: May 28 2025
Danville, IL
Bid Date: May 28 2025
Danville, IL
Bid Date: May 28 2025
Danville, IL
Bid Date: Jul 22 2021
Danville, IL
Bid Date: May 28 2025
Danville, IL
Bid Date: Apr 30 2025
Danville, IL
Bid Date: May 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
