BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 12, 2025

Site work for a water / sewer project in Guthrie, Oklahoma. Completed plans call for site work for a water / sewer project.

Quantity Unit Description 109.33 L.F. 8" PE SDR 17 Sewer Main (Pipe Burst) 2.00 Ea. 4' Dia. Manhole 23.92 V.F. Extra Depth Manhole 2.00 Ea. Remove Manhole 2.00 Ea. Sanitary Sewer Service A bid bond in the amount of 5% of the total amount bid shall be attached to all bids as a guarantee that the successful bidder will, within ten (10) days of the date of notice of award, enter into contract and file the required bonds. No bidder may withdraw his bid within 45 days after the actual date of the opening thereof. The Owner reserves the right to reject any or all bids, waive any irregularities or technicalities without assigning any reason therefore, and to make the awards in the best interest of the Owner *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. $57,000.00 - $72,914.00

Post-Bid

Water / Sewer

$72,914.00

Public - City

Site Work

12

22

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
565
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2025

July 11, 2025

Project location map

Multiple Locations, Guthrie, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.