Site work for a water / sewer project in Mesquite, Texas. Completed plans call for site work for a water / sewer project.

**As of July 9, 2025 this project has been awarded to J & L Construction, LLC for $1,228,052.55. The start and completion date has not yet been determined. The estimated cost for the project is $1,521,698.44. Reference Number 0000388404 Question Deadline 06/10/2025 at 2:00 PM CT Please submit all questions to purchasing@cityofmesquite.com Bidder must submit, with their Bid, a Cashier's check, Certified check or a Bid Bond from an approved surety company, in the amount of five percent (5%) of their Bid as a guarantee that the Bidder will enter into a contract and guarantee forms, if required, within 10 days after notice of award of contract. As set forth in the plans and specifications, this project is for relocating approximately 155 linear feet of 8" PVC sanitary sewer line, 120 linear feet of 6" PVC water line, 505 linear feet of 8" PVC water line, 120 linear feet of 8" PVC water line with 16" steel casing pipe, 430 linear feet of 12" PVC water line, 15 and 25 linear feet of 26" and 20" steel casing pipe extension, respectively, and fiber relocation by directional bore and open cut along Beltline Road as part of utility relocations necessitated by proposed TxDOT construction at US80 and Beltline Road. Council Awards Contract July 7, 2025 (Assumes no bidding irregularities or other issues with the low bidder requiring extensive checking of Qualifications The successful bidder must furnish both a Performance Bond and a Payment Bond, each in the amount of one hundred percent (100%) of the contract price, from an approved Surety company holding a permit from the State of Texas to act as surety, and acceptable according to the latest list of companies holding Certificates of Authority from the Secretary of the Treasury of the United States, or another Surety acceptable to the City. Notice to Proceed - Start Construction July 23, 2025 - (Assumes rapid execution of contract documents by the Contractor with proper insurance and bonds) Substantial Completion (150 Calendar Day Contract) December 19, 2025

Award

Water / Sewer

$1,228,053.00

Public - City

Site Work

39

10

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
5
Bidding Soon
2,594
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2025

July 23, 2025

Project location map

US 80 and Beltline Road, Mesquite, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.