Site work for a water / sewer project in Severna Park, Maryland. Completed plans call for site work for a water / sewer project.

The cost range for the Project is: $100,000.00-$250,000.00. Central Sanitation Facility – Bldg A Roof & Duct Repairs Questions regarding this Project should be directed to the PROJECT MANAGER, Chris Biggerstaff, at 410-222-3191 or pwbigg14@aacounty.org. The Work of this Project is located at the Central Sanitation Facility Complex, Building A, Maxwell Frye Road, Millersville, MD 21108. B. The Site of this Work is a public office building which serves public customers. 1. The Work of this Contract shall not impede daily operations of the facility. 2. Contractor shall arrange his operations so as not to interfere with the Owner's normal activities. 3. Mechanical and electrical work shall be performed in such sequence that interruptions of service will be of the shortest duration possible. 4. Refer to Section 011000 "Summary" for requirements for interruptions of utility services. 5. Noise, Vibration, Dust, and Odors: Coordinate operations that may result in high levels of noise and vibration, dust, odors, or other disruption to Owner occupancy with Owner. a. NotifyOwner not less than two days in advance of proposed disruptive operations. b. Obtain Owner's written permission before proceeding with disruptive operations. 1.6 WORK WEEK AND HOURS OF WORK A. All work, unless noted otherwise, shall be accomplished during the days and hours of work as follows: 1. Days of the Week: Monday through Friday. 2. Work inside Building in areas which may interrupt customer and workers: 4:30 PM - 7:30 AM (subject to Owner approval). 3. Work in Mechanical Rooms or on Roof: 7:30 AM to 4:00 PM. 4. Work inside Building which will not interrupt customers and workers: 7:30 AM - 4:00 PM. 5. Weekend Work: Saturdays and Sundays,, subject to Owner approval. B. Work shall commence upon dates set forth at the Pre-Construction Conference. Once work has commenced, it shall be accomplished in a continuous manner. C. Contractor may arrange, subject to Owner's approval, to gain access to the Building at times other than those specified. Contractor shall notify the Owner's Representative at least 48 hours prior to performing work at times other than those specified. All costs incurred by the Owner as a result of work during these times shall be the responsibility of the Contractor

Bid Results

Water / Sewer

$239,764.00

Public - County

Site Work

11

10

6

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
522
Active Projects
239
Bidding Soon
3,198
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

August 14, 2025

Project location map

445 Maxwell Frye Rd, Severna Park, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.