Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 23, 2025 at 8:00 PM
Updated May 24, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Flat Creek Township, Missouri. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Bridge Replacement on Glenn Road in Pettis County MO Length: 80' DBE Goal Determination: 12% Design Phase: New Bridge, PS&E and final documents. Preparations include but not limited to topographic and legal surveying, legal surveying, hydraulic analysis, utilities and environmental and historical preservation services/permits. Bid Phase: Advertising, letting and award services. Construction Phase: Work with the contractor on behalf of the County, assist with the pre-construction conference, perform periodic site inspections, prepare change orders, inspect construction materials, check shop drawings submitted by the contractor, conduct construction test and inspection, be present during critical construction operations, work with the County to do inspections, reporting and participate in the final inspection. The method of Contractor Selection has not been Determined at this time. MO DOT - RFQ Engineering - Glenn Rd Over Shaver Creek, Bridge Replacement
Conceptual
Bridges / Tunnels
$840,000.00
Public - City
Demolition, New Construction, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 5, 2026
Glenn Rd, Flat Creek Township, MO
Related To This Project
Flat Creek Township, MO
Bid Date: Jan 25 2024
Flat Creek Township, MO
Bid Date: Nov 14 2023
Columbia, MO
Bid Date: Jun 03 2025
Columbia, MO
Bid Date: Jun 18 2025
Eldon, MO
Bid Date: May 30 2025
Gravois Mills, MO
Bid Date: Jun 10 2025
Saint Louis, MO
Bid Date: Jun 06 2025
Farmington, MO
Bid Date: May 28 2025
La Plata, MO
Bid Date: May 23 2025
Saint Louis, MO
Bid Date: Jul 08 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
