BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work and paving for a civil project in Fairview, New Jersey. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2025 Various Locations Statewide; 100% State Funded, PE No: 2622635, CE No: 2623004 Estimated Range between $10,000,001 to $20,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 41 The Principal Items of Work Consist of: Bridge: Quantity Unit Description 6,300 Hour Lane Closures 7,040 Hour Repair Category "a", Movable 1,760 Hour Repair Category "b", Movable 7,040 Hour Welding Crew Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum wage rates for this project shall be as specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on file with this Department. The attention of bidders is directed to the provisions covering subletting or assigning the contract to Section 108-Prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The entire work is to be completed on or before the Estimated Completion Date Stated Above. DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 424 - Maintenance Movable Bridge and Tunnel Repair Contract, Statewide - 2025 Various Locations *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Submit all inquiries to the RE through the following: Division of Operations Support & Engineering, Movable Bridge Maintenance Group Mr. Louis Press, Senior Engineer 1035 Parkway Avenue Trenton, New Jersey 08625-0607 Telephone: 609-960-3078

Award

Bridges / Tunnels

$12,502,811.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
997
Active Projects
483
Bidding Soon
7,652
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 11, 2025

Project location map

Multiple Locations, Fairview, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.