Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Site work for a water / sewer project in Mokena, Illinois. Completed plans call for site work for a water / sewer project.
**As of August 08, 2025, this project has not yet been awarded. The project is expected to be awarded on August 12th, 2025.** The Project includes the following Work: Replacing three existing Allen Bradley SLC 5/04 controllers and I/O with Allen Bradley CompactLogix controllers and I/O, replacing 12 existing VFDs with new VFDs, new field wiring to existing and new control panels or field devices, and a short segment of new underground fiber-optic cable between two existing buildings. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder's maximum Bid price. Question Deadline 06/19/2025 Bidders will be required to comply with all laws, including those relating to the employment of labor and the payment of the general prevailing rate of hourly wages in the locality in which the work is to be performed for each craft or type of worker or mechanic needed to execute the contract or perform such work, also the general prevailing rate for legal holiday and overtime work (including, but not necessarily limited to 820 ILCS 130/1-12 the "Prevailing Wage Act") as ascertained by the Village or by the Illinois Department of Labor for Will County, Illinois shall be paid for each craft or type of worker needed to execute the contract or to perform such work. If at the time this Contract is executed, our if during the term of this Contract, there is excessive unemployment in Illinois as defined in the Employment of Illinois Workers on Public Works Act, 30 ILCS 570, as two consecutive months of unemployment exceeding 5%, CONTRACTOR agrees to employ a work force that consists of at least 90% Illinois laborers. An "Illinois laborer" is defined as any person who has resided in Illinois for at least 30 days and intends to become or remain an Illinois resident. The Bidder shall require all subcontractors (if any) to conform with said laws, and any rules or regulations now and thereafter issued pursuant to said laws by Bidder, his subcontractors, and/or anyone working through or on behalf of Bidder or Bidder's subcontractors. The Village of Mokena reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. The Strand Associates, Inc. project manager is Brent M. Studnicka, P.E., who can be contacted at Strand Associates, Inc., 1170 Houbolt Road, Joliet, IL 60431, (815) 744 4200 regarding the Project. For all further requirements regarding Bid submittal, qualifications, procedures, and Contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Award
Water / Sewer
$1,093,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2025
July 24, 2025
11400 191st St, Mokena, IL
Related To This Project
Mokena, IL
Bid Date: Aug 19 2025
Mokena, IL
Bid Date: Sep 09 2025
Mokena, IL
Bid Date: Sep 12 2025
Mokena, IL
Bid Date: Sep 11 2025
Mokena, IL
Bid Date: Oct 14 2025
Mokena, IL
Bid Date: Sep 22 2025
Mokena, IL
Bid Date: Jan 13 2026
Mokena, IL
Bid Date: Nov 19 2025
Mokena, IL
Bid Date: Jun 13 2025
Mokena, IL
Bid Date: Jun 13 2025
Mokena, IL
Bid Date: Mar 21 2025
Mokena, IL
Bid Date: Mar 17 2025
Mokena, IL
Bid Date: Apr 07 2025
Mokena, IL
Bid Date: Mar 04 2025
Mokena, IL
Bid Date: Feb 04 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
