BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 28, 2025 at 8:00 PM

Updated October 30, 2025

Site work and paving for a sidewalk / parking lot in Grain Valley, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work is generally described as follows: Buckner Tarsney Trail Construction SW Rock Creek Lane to SW Nelson Drive Each Bid shall be accompanied by a certified check, made payable to the City of Grain Valley, Missouri in an amount not less than five percent (5%) of the total Bid or by a Bid Bond with a Surety licensed to do business in the State of Missouri in the amount of five percent (5%) of the total Bid. This Security may be retained by the Owner until the Contract for the Project has been fully executed. All bidders must be on MODOTs Qualified Contractor List per Section 102.2 from the current version of the Missouri Standard Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. The DBE (Disadvantaged Business Enterprise) Goal is 8.0 % - refer to the DBE Submittal Forms and the DBE Program Requirements for Local Programs. No bidder may withdraw its Bid within 90 days after the actual date of the opening of Bids. The City of Grain Valley, Missouri reserves the right to award the Contract by sections, to reject any or all Bids, and to waive any informalities or irregularities therein. QA date - 10-22-2025 Any questions regarding the project, plans, specification, or bid documents should be directed to Lamp Rynearson, (816) 361-0440. The contractor questionnaire must be on file 7 days prior to bid opening.

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - City

Paving, Site Work

20

22

4

5

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
73
Bidding Soon
986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2025

November 28, 2025

Project location map

NW Buckner Tarsney Rd, Grain Valley, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.