BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 26, 2025

Site work for a military facility in Mosca, Colorado. Completed plans call for site work for a military facility.

BLM-CO SLVFO ZAPATA FALLS CAMPGROUND IMPROVEMENTS PHASE 1 This is a solicitation announcement for a campground expansion project located within the Bureau of Land Management Zapata Falls Recreation Site, located in Alamosa County, Colorado. Zapata Falls Campground is approximately 29 miles North and West of Alamosa along CO-150 N. Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. 1.1 PROJECT DESCRIPTION Furnishing labor, equipment, supplies, and materials, to convert existing Day Use Picnic Sites at Zapata Falls Campground into full campgrounds with mostly back in parking spaces. Work includes excavation and placement of earthen materials, placement of rock retention walls, demolition of existing day use areas, installation of tables and fire rings, installation of bear-proof trash cans, scarifying existing disturbed areas, and importing and placing aggregate surfacing material. 1.2 LOCATION Work under this Contract is performed at Zapata Falls Recreation Site, located in Alamosa County, Colorado. The project location is at latitude: 37 37'17.85"N, longitude: 105 33'34.48"W and is approximately 29 miles North and West of Alamosa along CO-150 N. The work locations are shown on the drawings and attached maps. 1.3 WORK SCHEDULE Work shall be completed by December 15, 2025. Work is not allowed on Federal holidays. Work shall occur Monday through Friday. Contract time will be paused, upon request, when snow or snowmelt prevents work at the project site. Recreation site will still be open to visitors and must be roped off and signed for safety. Period of Performance: September 1, 2025 - January 15, 2026 Rough Order of Magnitude - Between $100,000 and $250,000. Basic Contracting Requirements: 1. Active Registration - www.sam.gov - check it now please. Updates and registrations have been taking longer than they used to due to the transition from the DUNS number to the UEI. If having issues, don't pay anyone. Free assistance is available at your local PTAC - https://www.aptac-us.org/ 2. Invoicing and Payment - www.ipp.gov - 14 day prompt pay with progress payments 3. FAR Part 15 - Contracting by Negotiation 4. FAR Part 36 - Construction Provisions and Clauses 5. Davis Bacon Act Wages for Alamosa County, CO 6. Total Small Business Set-Aside for NAICS 237990 (Other Heavy and Civil Engineering Construction)- Size Std: $45M 7. Bid, Performance and Payment Bonding 8. Type of Contract - Firm Fixed Price 9. Basis of Award - Price and other Factors Minimum Requirements for Responsive Quote: 1. Filled in, priced, dated and signed SF1442 with acknowledgement of all amendments. 2. Schedule B filled in with prices. 3. Bid Bond - 20% of Price 4. Technical Response per Section L and M. 5. Email items 1-4 above to the POC no later than the solicitation close date. Primary POC: Contracting Officer Courtni Strickland c1strickland@blm.gov *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$250,000.00

Public - Federal

Site Work

28

10

8

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
108
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2025

September 1, 2025

Project location map

CO-150, Mosca, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.