Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 24, 2025 at 8:00 PM
Updated June 25, 2025
Site work and paving for a civil project in Nebraska City, Nebraska. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
construction of a three span 110 -0 continuous concrete slab bridge, culvert installation, and other related incidental work The project is located on County Road G, between Road 40 and Road 42, in Otoe County, Nebraska. The project is referred to as Dunbar Northwest, C-66(679) and shall include all labor, materials, transportation and equipment required for the construction of a three span 110 -0 continuous concrete slab bridge on a 0- degree skew with 28 ft. clear roadway, installation of an 84 x 72 corrugated metal pipe with 2 10-degree elbows, channel shaping, roadway grading, and related incidental work Along with its Bid Proposal, each bidder shall submit an unconditional Bid Bond or Certified Check made payable to the County Treasurer of Otoe County, Nebraska, in an amount equal to five (5) percent of the Bid Proposal. Also, each bidder is to provide a Start of Construction date and an End of Construction date with their Bid Proposal. The desired completion is November 30, 2025. The successful bidder (i.e. Contractor) will be allowed one hundred and ten (110) calendar days for completion after beginning work at the site, provided they do not exceed their specified completion date. Additional days due to weather may be granted at the discretion of the Engineer. Within ten (10) days following the award of the Contract, the successful bidder shall furnish a surety bond or bonds in an amount equal to or greater than the full amount of the contract. The surety and form of the bonds are subject to acceptance by the Otoe County Board of Commissioners. The Otoe County Board of Commissioners reserves the right to reject any and all bids or to waive any irregularities in bids received. Award of the Contract will be in accordance with the County Purchasing Act s competitive bidding considerations as set forth in Neb.Rev.Stat. 23-3110 to 23-3114. Otoe County is an Equal Opportunity Employer.
Award
Bridges / Tunnels
$954,984.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2025
September 29, 2025
County Rd G, Nebraska City, NE
Related To This Project
Nebraska City, NE
Bid Date: Jul 11 2025
Nebraska City, NE
Bid Date: Aug 06 2025
Nebraska City, NE
Bid Date: Dec 02 2025
Nebraska City, NE
Bid Date: Dec 15 2025
Nebraska City, NE
--
Nebraska City, NE
Bid Date: Feb 22 2024
Nebraska City, NE
Bid Date: May 01 2025
Nebraska City, NE
--
Nebraska City, NE
Bid Date: Mar 06 2025
Nebraska City, NE
Bid Date: Mar 04 2025
Nebraska City, NE
Bid Date: Mar 07 2025
Nebraska City, NE
Bid Date: Feb 20 2025
Nebraska City, NE
Bid Date: Nov 26 2024
Nebraska City, NE
Bid Date: Mar 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
