BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 4, 2025 at 8:00 PM

Updated June 11, 2025

Site work and paving for a road / highway in Guin, Alabama. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Bracket Estimate on This Project is From $200,000 to $250,000. This Bracket Range is Shown Only to Provide General Financial Information to Contractors and Bonding Companies Concerning the Project's Complexity and Size. This Bracket Should Not Be Used in Preparing a Bid, Nor Will This Bracket Have Any Bearing on the Decision to Award the Contract. The Principal Items of Work Are Approximately as Follows: 266 Sq. Yd. Of Crushed Aggregate Base Course, 3190 Sq. Yd. Of Reconstructed Base Coarse, 474 Tons of Coarse Aggregate, Aldot #467, 329 Tons of Asphalt Wearing Surface, 698 Tons of Asphalt Upper Binder, and 266 Sq. Yd. Of Plain Cement Concrete Pavement, Traffic Stripe, Construction Signs, Etc. The Entire Project Shall Be Completed in Thirty (30) Working Days. To Be Eligible for Consideration, Bids Must Be Submitted on Complete Original Proposals Made Available by the Owner. No Bid Documents Will Be Distributed Later Than 24 Hours Prior to the Scheduled Opening of Bids. A Cashier's Check (Drawn on an Alabama Bank) or Bid Bond for 5% of the Amount Bid (Maximum of $10,000) and Made Payable to the City of Guin Must Accompany Each Bid as Evidence of Good Faith. Prequalification is Not Required on This Project. Further Details and Definitions Regarding This Provision Are Included in Section 102 of Special Provision 18-lpa3 and Aldot's Standard Specifications. Proof of Insurance Coverages of the Types and Amounts as Set Forth in the Project Specifications Will Be Required of the Contractor, and Any and All Subcontractors, Prior to Beginning Work. The Contractor Will Be Required to Perform Work Amounting to at Least 30% of the Total Contract Cost With His Own Organization. The Right to Reject Any or All Bids and to Disregard Any Minor Irregularities is Reserved by the Owner. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Any questions or concerns must be directed to the ENGINEER in writing.

Post-Bid

Roads / Highways

$250,000.00

Public - City

Paving, Site Work

14

5

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2025

July 10, 2025

Project location map

Saw Mill Rd, Guin, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.