Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 13, 2025 at 8:00 PM
Updated June 19, 2025
Site work and paving for a mixed-use development in Birmingham, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reference Number 0000388350 General Description of Work: This project includes typical partial-depth pavement repairs on Willits Street (Old Woodward to Chester), Bates Street (Maple to north terminus), and Chester Street (Maple to Willits). Full-depth pavement repairs are also specified where needed to accommodate concrete curb and gutter road geometrical modifications, as well as a limited amount of underground utility work such as water main and storm drainage improvements. This project also includes concrete sidewalk and ramp improvements, driveway replacements and lawn restoration. Major work items include: approximately 4,300 square yards of partial depth milling & replacement, 2,350 square yards of full-depth pavement removal with 1,650 square yards of full-depth pavement replacement, 1,000 linear feet of new concrete curb and gutter; 2,985 square feet of new concrete sidewalks; 97 square yards of new concrete driveway approaches, 600 square yards of lawn restoration; 244 linear feet of new water main; 209 linear feet of new storm sewer; and other items to make a complete project. Question Deadline 06/07/2025 at 2:00 PM ET Questions are submitted online No All questions about meaning or intent of Contract Documents shall be submitted to the Engineer in writing. Address written inquiries to: Melissa A. Coatta, P.E. City Engineer City of Birmingham Engineering Department P.O. Box 3001 Birmingham, MI 48012 Phone: 248-530-1850 Fax: 248-530-1290 Email: mcoatta@bhamgov.org Complete all requested information on this form and submit it to the City of Birmingham at the information shown below before the close of business 5:00 p.m., Thursday, June 5 th , 2025. Attention: Mr. Cory Borton, Assistant Director of Engineering Email: cborton@bhamgov.org Receipt of the form may be confirmed by calling (248) 530-1850. Copies of this Sworn Statement form will be sent by email to prospective bidders upon request. The successful bidder shall be required to post bonds, and to comply with the contract requirements of the City Charter. Bids are firm, and no bid may be withdrawn for a period of sixty (60) days after opening of bids. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A certified check or bid bond in the amount of five percent (5%) of the base bid must accompany each bid proposal. The City reserves the right to reject any and all bid proposals, to waive any irregularity in any of the bid proposals submitted, and to accept any proposal which it shall deem to be the most favorable to the interest of the City.
Post-Bid
Roads / Highways
$700,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
July 14, 2025
Multiple Locations, Birmingham, MI
Related To This Project
Birmingham, MI
Bid Date: Jun 18 2025
Birmingham, MI
Bid Date: Jun 25 2025
Birmingham, MI
--
Birmingham, MI
--
Birmingham, MI
Bid Date: Sep 10 2025
Birmingham, MI
Bid Date: Oct 02 2025
Birmingham, MI
--
Birmingham, MI
Bid Date: May 02 2025
Birmingham, MI
--
Birmingham, MI
Bid Date: Jul 01 2025
Birmingham, MI
Bid Date: Apr 04 2025
Birmingham, MI
Bid Date: Mar 25 2025
Birmingham, MI
Bid Date: Mar 06 2025
Birmingham, MI
Bid Date: Mar 20 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
