BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a water / sewer project in Lewisville, Texas. Completed plans call for site work for a water / sewer project.

The Upper Trinity Regional Water District (owner), together with Freese & Nichols (designer) and Archer Western (CMAR), has initiated the PI - Doe Branch Parallel Interceptor under the Northeast Water Reclamation Expansion Project. During the current construction phase at Doe Branch WRP (27200 E University Dr., Little Elm, TX 75068), the contractor will install a parallel 54-inch fiberglass gravity interceptor within the UTRWD easement from Station 1+62 to Station 90+30. Most of the alignment will be installed via open-cut trenching across open fields and through emergent wetlands, with a single directional bore beneath US 380 to minimize traffic impacts. Once installed, the new line will be pressure-tested and tied into the existing Junction Box near fishtrap Rd. This work is being performed now to significantly increase conveyance capacity, provide operational redundancy, and ensure long-term reliability for the Doe Branch facility. The deadline to ask questions is 6/26/2025 2:00 PM CST Estimated cost is $24,850,000. Final completion - August 14, 2027 The CONSTRUCTION MANAGER at RISK (CMAR) intends to award this Proposal Package to the PROPOSER whose proposal provides the best value for Upper Trinity Regional Water District (UTRWD). The proposer must be capable of bonding the proposed contract price with a Surety licensed to conduct business in the State of Texas and maintaining an A.M. Best Rating of A or better. Proposer shall provide a letter from the Proposer's Surety stating the Surety is familiar with the project and the Proposer is approved for securing 100% Performance and Payment Bonds for the price submitted for the project. Any Proposer not capable of providing these bonds will not be considered and their proposal will be returned as non-responsive. The best value for UTRWD will be based on the base proposal price along with the Proposer's Qualifications. and Safety Record. The total maximum point value is equal to 100 points.

Post-Bid

Water / Sewer

$24,850,000.00

Public - County

Site Work

48

21

64

6

Subscribe For Documents

67 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
397
Active Projects
222
Bidding Soon
3,988
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

August 18, 2025

Project location map

Multiple Locations, Lewisville, TX


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.