Published June 27, 2025 at 8:00 PM
Updated June 28, 2025
Site work and paving for a road / highway in Coburg, Oregon. Completed plans call for site work for a road / highway; and for paving for a road / highway.
**As of June 27, 2025, the project was awarded to Wildish Construction Co., with an awarded amount of $575,109.25.** Project: N Coburg Industrial Way (Coburg) 900198 1 LS Mobilization; 1 LS Temp Work Zone Traffic Control, Complete; 1 LS Temporary Work Zone Pedestrian Traffic Control, Complete; 1 LS Erosion Control; 1 LS Concrete Washout Facility; 4 EA Inlet Protection, Type 3; 3 EA Inlet Protection, Type 10; .03 AC Temporary Mulching, Straw; 1 LS Pollution Control Plan; 1 LS Protect Monitoring Wells; 1 LS Removal of Structures and Obstructions; 1 LS Clearing and Grubbing; 424 CY General Excavation; 69 FT 10 Inch PVC Storm Drain Pipe; 3 EA Catch Basin, with Bike Proof Grate; 2 EA Connect to Existing Pipe; 2 EA Connect to Existing Structure; 5 EA Adjusting Boxes; 2 EA Adjusting Cleanouts; 4 EA Adjusting Manholes, Minor Adjust; 11,573 SY Cold Plane Pavement Removal, 2 Inches Deep; 1,462 SY Aggregate Base, 3 Inches Thick; 1,452 TN Level 2, 1/2 Inch ACP Mixture; 443 SY 6" Asphalt Concrete Pavement Repair; 39 FT Concrete Curbs; 639 FT Concrete Curbs, Curb and Gutter; 3,995 SF Concrete Driveway, 7 Inches Thick; 9,071 SF Concrete Walks, 6 Inches Thick; 9,071 SF Concrete Walks, Ramps, 6 Inches Thick; 1,532 SF Concrete Walks and Mono Curb, Ramps, 6 Inches Thick; 297 SF Truncated Domes on New Surfaces; 7 EA Bi-Directional Blue Type 1AR Markers; 1,679 FT Thermoplastic, Extruded, Surface, Non-Profiled; 2 EA Pavement Legend, Type B-HS, Bike Symbols; 1 EA Pavement Legend, Type B-HS, Disabled Parking; 17 EA Remove and Reinstall Existing Signs; 1 LS Sign Support Footings; 1 LS Perforated Steel Square Tube Anchor Sign Supports; 20 SF Signs, Standard Sheeting, Sheet Aluminum; 7,570 SF Lawn Seeding; 1,180 SF Bark Mulch; 17 EA 3 Gal Shrubs; 4 EA 5 Gal Shrubs; 1 LS Irrigation System; 1 FA Irrigation Repair/Relocation All work must be completed November 30, 2025 per Special Provision 00180.50(h). The Agency reserves the right to issue Addenda making changes or corrections to the Plans, Specifications or quantities. The Agency will provide Addenda only by publishing them on the Oregon Buys website. (See 00110.05(e)). No additional notification of addendum issuance will be provided. Bidders are required to submit a first-tier subcontractor disclosure form, substantially as described in ORS 279C.370, within two working hours of the bid closing date and time. No bid will be accepted by the City unless it contains a statement by the bidder as a part of the bid that the bidder in carrying out the contract will comply with all applicable laws. The City of Eugene is an Equal Employment Opportunity and Affirmative Action Employer. The policy of the City of Eugene is to provide equal opportunity for participation in its contracting activities to all persons and firms in compliance with applicable Federal and State laws, rules and regulations. The City of Eugene in accordance with Title VI of the Civil Rights Act of 1964, 79 Stat. 252, 42 U.S.C. 2000d to 2000-4 and Tile 49, Code of Federal Regulations, Department of Transportation, subtitle A, Office of the Secretary, Part 21, nondiscrimination in federally assisted program of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color or national origin in consideration for an award. This project contains a 0% DBE Goal. The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Roads / Highways
$575,109.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 12, 2025
July 14, 2025
Coburg Industrial Way, Coburg, OR
Related To This Project
Coburg, OR
--
Coburg, OR
Bid Date: Mar 18 2025
Coburg, OR
Bid Date: Aug 27 2024
Coburg, OR
--
Coburg, OR
Bid Date: May 22 2024
Coburg, OR
Bid Date: Jun 22 2022
Coburg, OR
Bid Date: Aug 20 2020
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.