Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 3, 2025 at 8:00 PM
Updated October 4, 2025
Renovation of a clubhouse / community center in Courtice, Ontario. Completed plans call for the renovation of a clubhouse / community center.
* Award subject to final approval. The Municipality of Clarington (Municipality) is seeking a qualified company for the replacement of the boilers at the Courtice Community Complex Question Deadline: Wed Jun 4, 2025 2:00:00 PM (EDT) Duration in months: 4 The scope of work shall include but not limited to the provision of all labour, materials and equipment required to perform following work: 1. Remove and replace three heating boilers (P-1, P-2 & P-3), three primary heating pumps (P-1, P-2 & P-3) and two secondary pumps (P-4 & P-5) in the basement mechanical room. 2. Provide new gas fired condensing boilers (B-1, B-2 & B-3) complete with new boiler breeching. 3. Provide three primary pumps (P-1, P-2 & P-3) and two secondary pumps (P-4 & P-5) and 4. Remove and replace heating piping, boiler breeching, gas pipe, domestic cold-water piping. 5. Remove and replace of electrical and controls items associated with the boilers and pumps. 6. Cut/patch block wall enclosure in the storage room. Provide adequate barricading in the construction zone. All work is to be completed in accordance with terms, conditions and specifications stated herein. Review design drawings and general function of each system including associated equipment, control sequences and operation cycles. Confirm listing of flow and terminal measurements to be performed. Confirm balancing valve and damper locations are adequate for system balancing. Recommend additional locations to Contractor and Consultant if required to complete system balancing. o^putline procedures for taking test measurements to establish compliance with requirements. Specify type of instrument to be used, method of instrument application and correct factors. Balance and adjust entire air and hydronic water systems upon completion of the work. Use approved report format as approved by the Consultant to record all results. Submit sample to Consultant for approval prior to balancing. Contact Consultant during or immediately following balancing procedures to discuss any concerns or issues prior to issuing any reports. Submit one (1) copy of the Balance Report to the Consultant for review. Make adjustments as directed by the Consultant. Include for a minimum of one (1) return visit for any adjustments and/or to work with the Contractor to investigate any issues. Revise report and resubmit to the Consultant for review. Upon acceptance of the report, include one (1) final accepted copy in maintenance manuals. Assist and participate throughout testing or commissioning of the system as requested by the Contractor or Commissioning Agent. Allow for a minimum of four (4) hours on site dedicated to testing and commissioning assistance.
Award
Clubhouse / Community Centers
$395,846.00
Public - County
Renovation
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 9, 2025
July 9, 2025
2950 Courtice Rd, Courtice, ON
Related To This Project
Courtice, ON
--
Courtice, ON
Bid Date: Aug 05 2025
Courtice, ON
Bid Date: Nov 14 2025
Courtice, ON
Bid Date: Jan 06 2026
Courtice, ON
Bid Date: Jan 07 2026
Courtice, ON
--
Courtice, ON
--
Courtice, ON
Bid Date: Apr 29 2025
Courtice, ON
Bid Date: Apr 22 2025
Courtice, ON
Bid Date: Apr 02 2025
Courtice, ON
Bid Date: Feb 13 2025
Courtice, ON
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
