BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a mixed-use development in Lovell, Wyoming. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The work consists of furnishing all labor, materials, tools, equipment, transportation, and services necessary for: Approximately 172,310 lineal feet crack seal and 45,565 square yards seal coat on existing asphalt parking lots, in addition to appx. 6,700 square feet of asphalt hot mix patching. Each bid must be accompanied by a bid bond with sufficient surety for not less than five percent (5%) of the total amount of such bid, payable to and to be forfeited to, Big Horn County School District #2 as liquidated damages if bidder fails to enter into the contract within thirty (30) days after award to bidder, or fails, at the time of executing the agreement, to furnish a performance bond and a payment bond, each in the amount of one hundred percent (100%) of the bid. The Contract shall be let to the responsible certified resident making the lowest bid, if the certified resident's bid is not more than five percent (5%) higher than that of the lowest responsible nonresident bidder and the resident bidder does not propose to subcontract more than thirty percent (30%) of the work to nonresident contractors (Wyo. Stat. 16-6-101, et seq.). Question Deadline 05/30/2025 There are no specific DBE goals on this project, but the use of DBE contractors is encouraged. Bids will be received at Big Horn County School District #2 Administration Office, 502 Hampshire Ave, Lovell, Wyoming 82431 until 2 P.M. Local Time, on the * day of *, at which time the bids will be publicly opened and read aloud. All bids must be furnished on forms supplied by the Project Manual or copies thereof. Sealed envelopes containing bids shall be clearly marked BIG HORN COUNTY SCHOOL DISTRICT #2, 2025 DISTRICT ASPHALT MAINTENANCE PROJECT, #PME-052501. and shall show the name and address of the Bidder on the outside. Bids which are not prepared and filed in accordance with the Instructions to Bidders may be rejected. Big Horn County School District #2 Board of trusties reserves the right to reject any and all bids and the right to waive irregularities in bids received. A partial completion date for the work will be August 10, 2025, with a project completion date of August 29, 2025. For questions regarding the project contact William Bridges, PE, at the following telephone number: (307) 548-9913.

Award

Roads / Highways

$234,243.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
11
Bidding Soon
184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2025

July 7, 2025

Project location map

Multiple Locations, Lovell, WY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.