BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 7, 2025 at 8:00 PM

Updated June 8, 2025

Site work, paving, outdoor lighting and new construction of a mixed-use development in Grand Lake, Colorado. Completed plans call for the construction of a 2,800-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000388477 Bid Intent Not Available The Town of Grand Lake, Colorado (TOGL) has received grants from the Colorado Department of Local Affairs (DOLA) and from Colorado Creative Industries (CCI) to design and construct and the "Space to Create" project located at the corner of Park Avenue and Hancock Street in Grand Lake, Colorado. The project will consist of approximately nine (9) units of affordable rental housing and an approximate 2,800 SF Creative Hub building. The rental units shall provide live/work type residential units to households of 80% Area Median Income (AMI) and remain affordable as defined in C.R.S. 24-32-133(1)(a) for a minimum of twenty (20) years. The grants from DOLA ($4M) and CCI ($3M) have been secured and will require laborers be compensated using the local Davis-Bacon wage rate scale. The TOGL will provide necessary supplemental funding for the project. DOLA grant is primarily limited to infrastructure and not for vertical or above grade construction. The CCI grant will be used for vertical construction. The prefabricated modular housing units will be provided by the TOGL, delivered and stored on adjacent property in the early first quarter of 2026. The 9 housing units consist of 13 modular boxes that will be delivered complete with interior finishes, appliances, mechanical, electrical and fire protection systems in place. The scope of the General Contractor will be limited to foundations with crawl space, setting and stitching together the modular boxes, connecting utilities into the units, over framed roof trusses and roofing, and exterior cladding. The Creative Hub will consist of an approximate 2,800 SF Pre-Engineered Metal Building (PEMB) provided and erected by a third-party contractor in the first quarter of 2026.. The scope of work of the General Contractor will be limited to foundations and slab, utilities stubbed up through the slab and the exterior cladding of the PEMB. Interior finishes, mechanical, electrical and fire protection systems of the PEMB will be constructed by the third-party contractor. Through this Request for Qualifications/Proposal (RFQ/P) the TOGL wishes to retain the services of a qualified General Contractor to construct the Space to Create project, Additionally, the TOGL has retained MA Studios to provide architecture and engineering services for the project and will provide an Owner's Representative to oversee the Project's construction. The Work of this RFQ/P includes, but not limited to, construction of utilities: subsurface work and extension of utilities onto the project site; improvement of adjacent right of way: parking, sidewalks/boardwalks, earthwork, asphalt, and concrete; stormwater management; landscaping, foundations for the affordable housing and Creative Hub building, setting the prefabricated modular housing units on the foundation and stitching them together, roof framing and roofing for the modular housing units, exterior cladding and integration of weather sealing all openings for the modular housing units and PEMB of the Creative Hub, mechanical and electrical connections to the modular housing units, site lighting, trash enclosure, landscaping (hard and soft surfaces) and irrigation. Anticipated General Contractor Services - Start September 15, 2025 Anticipated Construction Services - Start - Finish September 15, 2026 Question Deadline 05/30/2025 at 10:00 AM MT Questions are submitted online Yes

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$70,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

1

3

88

4

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
2
Bidding Soon
981
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2025

September 15, 2025

Project location map

1128 Park Ave, Grand Lake, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.