BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2025 at 8:00 PM

Updated June 29, 2025

Demolition, site work and new construction of a residential development in Bryan, Texas. Completed plans call for the demolition of a residential development; for the construction of a residential development; and for site work for a residential development.

July 2025 - Anticipated date of Award 1. Work to be performed in the construction drawings and Building Notes shall comply with the manufacturers recommendations and all currently adopted International Building Codes and Electrical Code, as well as all other applicable City codes, code amendments and ordinances. 2. Inclement Weather Days - It is imperative to maintain a tight timeline for the demolition and construction activities of this project. Days to complete the project may be added to the original Contract Time for only the bulleted reasons listed below and only if requested in writing from the Contractor within 5 business days of the inclement weather and only during the original Contract Time period. It will be up to the Contractor to prove the inclement weather at the project site impeded the progress of the work. If inclement weather day extensions are added to the Contract Time, they will be provided in a written Change Order and executed by the Owner, Contractor and City Staff Representative. Any time delays over the Contract Time, as may be revised, will be assessed liquidated damages as per the Tri-Party Agreement contract. a. Rainfall in excess of 1/4 " per day. Project Manager, at his/her discretion, may allow additional days for drying of the ground or issues impeding concrete placement. This will only be allowed until the Contractor has had reasonable time to frame the structurewith roof decking and a rolled asphalt cover protecting the building from rainfall inside the structure. b. Weather in which the low temperature is below 32o and the high temperature does not advance above 45o per day. Project Manager, at his/her discretion, may allow additional days for issues impeding concrete placement. This will only be allowed until the Contractor has had reasonable time to frame the structure, and is able to place sheathing over the building exterior envelope openings to heat the building interior by safe mechanical means. The City of Bryan is soliciting bids for the demolition and re-construction of a residential structure, located at 807 Boulevard Street, Bryan, Texas. Question Cuttoff Date & Time 6/20/2025 11:00:00 AM (ET) In order to ensure a fair and objective RFB process and evaluation, all questions and inquiries related to this Request for Bid shall be addressed in writing via the Brazos Valley eMarketplace Online Bidding System

Post-Bid

Residential Subdivision

$30,000.00

Public - City

Demolition, New Construction, Site Work

5

11

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
375
Active Projects
139
Bidding Soon
3,619
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2025

July 28, 2025

Project location map

807 Boulevard St, Bryan, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.