BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work and paving for a civil project in Elgin, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and bridge / tunnel.

**As of July 18, 2025, the project was awarded to Schroeder Asphalt, with an awarded amount of $3,096,097.43.** City/County Elgin The City of Elgin 2025 Highland Woods Resurfacing Project Consists of Pavement Patching, Pavement Milling, Hma Resurfacing, Curb and Gutter Removal and Replacement, Structure Adjustments, Hma And Pcc Driveway Removal and Replacement, Pipe Culvert Removal and Replacement, Landscape Restoration, Traffic Control, and All Other Ancillary Work Required to Complete the Project. Project Location: Various Local Roads in the City of Elgin, Kane County The proposed Work is generally described follows: This project in general (approximately 33,559 linear feet in length) includes but is not limited to furnishing all labor, materials, equipment and other as included items necessary for the completion of the following approximate quantities: 3,600 SY of Hot-Mix Asphalt Partial Depth Patching, 111,185 SY of Hot-Mix Asphalt Milling, 9,095 tons of Hot-Mix Asphalt Binder Course, 9,740 tons of Hot-Mix Asphalt Surface Course, 6,930 FT of Concrete Curb & Gutter Removal & Replacement, 19,689 SF of Sidewalk Removal & Replacement, 30 Structures To Be Adjusted or Reconstructed, 18,430 LF of Thermoplastic Pavement Markings, 3,112 SY of Landscape Restoration, 4,100 SY of Class D Patches, 4 Inch and other miscellaneous items of work in accordance with the Contract Plans and Specifications. All proposals must be accompanied by a bid bond, certified or cashier's or a bank draft in an amount equal to at least five percent (5%) of the bid, payable without condition to the City of Elgin, Illinois, which sum shall be forfeited in case the successful bidder fails to enter into a binding contract and provide a properly executed contract surety bond within 15 days after the contract is awarded by the City Council. Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - 2025 Highland Woods Resurfacing Project Question Deadline 06/05/2025 at 12:00 PM CT

Award

Roads / Highways

$3,096,097.00

Public - City

Paving, Site Work

80

8

2

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
528
Active Projects
273
Bidding Soon
3,794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

August 11, 2025

Project location map

Multiple Locations, Elgin, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.