BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Site work for a bridge / tunnel in Kelvington, Saskatchewan. Completed plans call for site work for a bridge / tunnel.

Supply and Installation of One 1 350 Mm Diameter by 48 M Length and One 750 Mm Diameter by 39 M Length Smooth Wall Steel Pipe Culverts by the Boring Method at Two Locations Through Highway No. 38 Near Greenwater Lake; for a Total Length of 87 M. Question Deadline 06/09/2025 Bidders shall submit all inquiries pertaining to the Bid Package documents a minimum of 3 business days prior to close of bidding directed to: Ministry of SaskBuilds and Procurement RFXquestions@gov.sk.ca Bidders may request a debriefing session from Ministry of SaskBuilds and Procurement by emailing constructionsbp@gov.sk.ca within 30 days after the award notification date. The intention of the debriefing is to aid the Bidder by identifying areas of improvement that may be applied to subsequent procurement opportunities. Additional Information: Estimated Quantities: Supply And Installing Culverts By Tunnelling Or Boring, As Per Special Provisions: 87 m Random Riprap Type 1: 170 m3 Completion Date: Phase I: March 20, 2026 Phase II: June 29, 2026 Deposit with each Tender - 5% of total bid. Deputy Minister of Highways

Award

Bridges / Tunnels

$620,349.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
42
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

Project location map

SK-38, Kelvington, SK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.