Published June 27, 2025 at 8:00 PM

Updated July 4, 2025

Site work for a communication facility in Spencer, Indiana. Completed plans call for site work for a communication facility.

Project Description: The Project Consists of Infrastructure Work for Public Safety Communications. Work Will Occur at One Site. The Site Will Consist of a 25' X 25' Compound That Contains a Three-legged, 180' Tall Public Safety Communication Tower. The Tower Compound Will Be Surfaced in Gravel and Accessed by a Gravel Drive. The Foundation for the Tower Will Consist of Three Concrete Piers, Extending Into the Ground and Onto a Reinforced Concrete Mat Foundation. The Compound Will Be Enclosed With a Chain Link Fence With Barbed Wire Along the Top. 4. Contract Documents Prepared by: Pyramid Consulting 6929 E. 10th St. #230 Indianapolis, in 46219 Phone: 317- 396-9426 Bid Document 001300 - State Board of Accounts Form 96 (Including Financial Statement) B. Bid Document 003000 - Stipulated Bid Form - Base Bid. C. Bid Security (See Below) 7. Each Envelope That Bids Are Included in is Required to Have a Label on the Outside Indicating Project Name, Contractor's Name and Address, and Trade Packages Bid. F. Miscellaneous Provisions 1. Each Proposal Shall Be Accompanied by a Certified Check or Acceptable Bidder's Bond Made Payable to the Owner, in a Sum of Not Less Than Five Percent (5%) of the Total Amount of the Highest Aggregate Proposal, Which Check or Bond Will Be Held by the Owner as Evidence That the Bidder Will, if Awarded the Contract, Enter Into the Same With the Owner Upon Notification From Him to Do So Within Ten (10) Days of Said Notification. Should a Successful Bidder Withdraw His Bid, or Fail to Execute a Satisfactory Contract, the Owner May Then Declare the Bid Deposit of Bond or Check Forfeited as Liquidated Damages but Not as a Penalty. 2. For Contracts Over $200,000, Approved Performance and Payment Bonds Guaranteeing Faithful and Proper Performance of the Work and Materials, to Be Executed by an Acceptable Surety Company, Will Be Required of the Contractor at the Time He Executes His Contract. The Bond Will Be in the Amount of 100% of the Contract Price and Must Be in Full Force and Effect Throughout the Term of the Construction Contract Plus a Period of Twelve (12) Months From the Date of Substantial Completion. 3. The Owner Reserves the Right to Reject Any Proposal, or All Proposals, or to Accept Any Proposal or Proposals, or to Make Such Combination of Proposals as May Seem Desirable, and to Waive Any and All Informalities in Bidding. Any Proposal May Be Withdrawn Prior to the Above Scheduled Time for the Opening of Proposals or Authorized Postponement Thereof. Any Proposal Received After the Time and Date Specified Shall Not Be Considered. The Owner Reserves the Right to Accept or Reject Any Bid or Waive Any Informality or Errors in Bidding for a Period of 90 Days After Bid Date. 4. A Conditional or Qualified Bid Will Not Be Accepted. Award Will Be Made to the Low, Responsive, Responsible Bidder. 5. All Applicable Laws, Ordinances, and the Rules and Regulations of All Authorities Having Jurisdiction Over Construction of the Project Shall Apply to the Project Throughout. 6. Proposals Shall Be Properly and Completely Executed on Proposal Forms Included in the Project Manual. Proposals Shall Include All Information Requested by State Board of Accounts Form 96 (Revised 2013) Included Within the Project Manual.

Post-Bid

Communication

$220,000.00

Public - County

Site Work

9

12

8

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
123
Bidding Soon
1,350
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2025

August 4, 2025

Project location map

Multiple Locations, Spencer, IN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.