Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 25, 2025 at 8:00 PM
Updated June 26, 2025
Site work and paving for a mixed-use development in Saint Paul, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.
Construction Manager at Risk (Construction Manager) services for preconstruction and construction services for ADA upgrades for the tunnel between Capitol Building (aka Cap) and State Office Building (aka SOB), St. Paul, MN. The Department of Administration, on behalf of the State of Minnesota, is seeking a Construction Manager at Risk services for the ADA upgrades for the tunnel between the Cap-SOB. The easternmost portion of the tunnel of approximately 100-feet length located closest to the Capitol Building, does not currently meet accessibility code with its slope that exceeds the recommended 1:12 ratio and lack of landings at every 30-inches of vertical rise. The proposed tunnel upgrade for accessibility includes a reconstruction of the tunnel, installing an elevator within the Capitol Building and associated modifications to surrounding areas.
Post-Bid
Bridges / Tunnels
$6,104,636.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
39
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 23, 2025
June 1, 2026
Multiple Locations, Saint Paul, MN
Related To This Project
Saint Paul, MN
Bid Date: Jun 13 2025
Saint Paul, MN
Bid Date: Jun 06 2025
Saint Paul, MN
Bid Date: Jun 12 2025
Saint Paul, MN
Bid Date: Jun 18 2025
Saint Paul, MN
Bid Date: Jul 08 2025
Saint Paul, MN
Bid Date: Jun 18 2025
Saint Paul, MN
--
Saint Paul, MN
Bid Date: Jul 03 2025
Saint Paul, MN
Bid Date: Jun 17 2025
Saint Paul, MN
Bid Date: Jun 26 2025
Saint Paul, MN
Bid Date: May 29 2025
Saint Paul, MN
Bid Date: Jun 18 2025
Saint Paul, MN
Bid Date: Jun 12 2025
Saint Paul, MN
Bid Date: May 28 2025
Saint Paul, MN
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
