Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 18, 2025 at 8:00 PM
Updated June 19, 2025
Site work for a playground / park / athletic field in Bonnyville, Alberta. Completed plans call for site work for a playground / park / athletic field.
The Town of Bonnyville is inviting manufacturers to submit a proposal for the design, supply and installation of a playground. This will be a new playground within The Town of Bonnyville. The structure must be designed and installed following the CAN/CSA Z614 standards. Playground to include Intended age range 18 months -12 years Maximum allowable border size - 60ft by 40ft Include swing set or swinging feature(s) Installation to be scheduled summer 2025 Excavation for the project and protective surfacing - Sand (completed by the Town) Project Budget $50,000.00 The proposal is to include: Design, supply, installation, and all taxes included Description of each component incorporated within the playground structure proposed Three dimensional drawings, to scale, of the assembled playground structure All material specifications A product brochure
Award
Playgrounds / Parks / Athletic Fields
$47,619.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2025
August 1, 2025
Multiple Locations, Bonnyville, AB
Related To This Project
Bonnyville, AB
Bid Date: Jul 03 2025
Bonnyville, AB
Bid Date: Jul 08 2025
Bonnyville, AB
Bid Date: Jul 09 2025
Bonnyville, AB
Bid Date: Jul 11 2025
Bonnyville, AB
Bid Date: Sep 16 2025
Bonnyville, AB
Bid Date: Oct 07 2025
Bonnyville, AB
Bid Date: Oct 31 2025
Bonnyville, AB
Bid Date: Nov 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
