BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 21, 2025 at 8:00 PM

Updated June 22, 2025

Site work and paving for a road / highway in Keystone, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000388733 Bid Intent Not Available The Town of Keystone (hereinafter referred to as "Town") is seeking proposals from firms (hereinafter referred to as "Contractor") to provide construction management and general contractor services for the construction of a segment of Keystone Ranch Road, beginning at the Intersection of Soda Ridge Road and continuing to Saw Whisker Circle in Keystone, CO. Scope of Work: The Town is seeking a qualified and experienced contractor to construct the roadway and provide general contractor services. The Scope of Work includes the following: 1. Preconstruction Services - Design Review: Contractor shall review the plans and provide any comments, recommendations, and value engineering. Contractor shall work with Town staff to discuss any comments, changes, or recommendations for the design. Contractor shall attend meetings with Town , provide support for any utility relocation/abandonment work with utility agencies, and work to procure construction materials. 2. Preconstruction Services - Coordination with Developer: Contractor shall work with the Town to coordinate work phasing (if needed), schedule, and other construction coordination details. 3. Construction: Contractor shall complete the construction and construction management for all work needed to complete the project as shown in the project construction plans Exhibit A. Work includes demolition of current roadway, grading and drainage, traffic control, and construction of new roadway. Additional work items include: a. Coordination between the Town and Contractor throughout project and attendance at meetings. b. The project funding is locally funded. The Contractor shall supply all documentation and reporting to the Town if so required. Contract Award June 24, 2025 Begin Construction/Mobilization* July / August 2025 Final Completion* September 2025 Question Deadline 06/10/2025 at 5:00 PM MT Questions are submitted online Yes, All questions concerning this RFP must be submitted by email to Joshua Weber, Public Works Director of the Town of Keystone, at jweber@keystoneco.gov The Town reserves the right to reject any or all proposals or accept what is, in its judgment, the proposal which is in the Town's best interest. The Town further reserves the right, in the best interests of the Town, to waive any technical defects or irregularities in any and all proposals submitted.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

12

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
67
Bidding Soon
1,384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 20, 2025

July 1, 2025

Project location map

Keystone Ranch Rd, Keystone, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.