Remodeling of an educational facility in Keystone, Colorado. Completed plans call for the remodel of a one-story above grade educational facility.
**As of November 6th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Question Deadline 10/16/2025 at 2:00 PM MT Deadline for Emailed Questions to kris.garnhart@asd20.org All questions regarding proposal preparation, the selection process, specifications and interpretations of the terms and conditions of the RFP shall be submitted via email There will be a mandatory pre-proposal conference/job walk held for this project on October 10, 2025 at 9:00cam starting at Foothills Elementary School, 825 Allegheny Drive, Colorado Springs, CO, 80919. We will then proceed to Academy International Elementary School, 8550 Charity Dr., Colorado Springs, CO 80920, then to Academy Endeavor Elementary School, 3475 Hampton Park Dr., Colorado Springs, CO 80920, then to Explorer Elementary School, 4190 Bardot Dr., Colorado Springs, CO 80920, and then to Prairie Hills Elementary School 8025 Telegraph Dr., Colorado Springs, CO 80920. Academy District 20 is requesting proposals from qualified contractors to replace restroom sinks at four locations. Detailed information is provided in Attachment E: Scope of Work. Proposals should address the requirements and will be evaluated based on the information provided. There is a mandatory pre-proposal conference/job walk for the project at specified school locations. Instructions for submitting proposals include marking the offer clearly with the RFP identifier and sending it to the designated contact email address. The proposal must adhere to the schedule outlined in the instructions. Description: Contractor to provide all labor, materials, supervision, trash disposal and dumpsters, storage containers, and all other items needed for a complete project to complete restroom upgrades as indicated in the scope of work for each location. Refer to Attachment H for plans and photos for information. Refer to Guideline Specifications for information pertaining to product types for plumbing fixtures. The scope of work for these restroom upgrade projects will be as follows: Foothills Elementary School: o Restroom #1: No work in this restroom. This restroom is shown as an example of the finishes desired in other restrooms at this location. o Restroom Area 2: o Remove and properly dispose of existing floor tile, sinks, urinals, toilets, toilet partitions, mirrors, all dispensers, and grab bars. Save dispensers and grab bars for reuse. o Prep floors as required to allow for installation on new floor tile. Provide and install new floor tile (approximately 12" x 24"). Colors to selected by owner. o Prep existing CMU wall to accept new tile. Provide and install new wall tile (approximately 6" x 6" glazed) from floor to ceiling. o Repair existing drywall ceiling to accept new paint. Paint existing drywall ceiling with 2 coats of paint. Color to be selected by owner. o Provide and install new wall mounted sinks with new faucets and p-traps, wall mounted urinals with new flush valves, and new toilets with new flush valves. o Provide and install new toilet partitions. Partitions to match existing layout and type. Color to be selected by owner. Provide shop drawings for approval prior to ordering materials. o Provide and install new mirrors above sinks. Re-install existing dispensers and grab bars. o Restroom Area 3: o Remove and properly dispose of existing floor tile, sinks, urinals, toilets, toilet partitions, all dispensers, and grab bars. Save dispensers and grab bars for reuse. o Prep floors as required to allow for installation on new floor tile. Provide and install new floor tile (approximately 12" x 24"). Colors to selected by owner. o Prep existing CMU wall to accept new tile. Provide and install new wall tile (approximately 6" x 6" glazed) from floor to ceiling. o Repair existing drywall ceiling to accept new paint. Paint existing drywall ceiling with 2 coats of paint. Color to be selected by owner. o Provide and install wall mounted urinals with new flush valves, and new toilets with new flush valves. Reinstall existing dispensers and grab bars. o Provide and install new toilet partitions. Partitions to match existing layout and type. Color to be selected by owner. Provide shop drawings for approval prior to ordering materials. o Remove and properly dispose of existing countertop, sinks, and faucets, off corridor that adjoins restrooms. o Mirror on back wall to remain. Soap and paper towel dispensers to remain. o Contractor to provide and install new solid surface countertop with openings for trash can, undermount sinks, faucets, and p-traps. Provide shop drawings for approval prior to ordering materials. o Restroom Area 4: o Remove and properly dispose of existing floor tile, countertops, sinks, mirrors, urinals, toilets, toilet partitions, all dispensers, and grab bars. Save dispensers and grab bars for reuse. o Prep floors as required to allow for installation on new floor tile. Provide and install new floor tile (approximately 12" x 24"). Colors to selected by owner. o Prep existing CMU wall to accept new tile. Provide and install new wall tile (approximately 6" x 6" glazed) from floor to ceiling. o Repair existing drywall ceiling to accept new paint. Paint existing drywall ceiling with 2 coats of paint. Color to be selected by owner. o Provide and install wall mounted urinals with new flush valves, new toilets with new flush valves, and new solid surface countertops with undermount sinks, new faucets, and new p-traps. Provide shop drawings for new countertop for approval prior to ordering materials. Reinstall existing dispensers and grab bars. o Provide and install new toilet partitions. Partitions to match existing layout and type. Color to be selected by owner. Provide shop drawings for approval prior to ordering materials. o Provide and install new mirrors above sinks. o Restroom Area 5: o Remove and properly dispose of existing floor tile, sinks, urinals, toilets, toilet partitions, all dispensers, and grab bars. Save dispensers and grab bars for reuse. o Prep floors as required to allow for installation on new floor tile. Provide and install new floor tile (approximately 12" x 24"). Colors to selected by owner. o Prep existing CMU wall to accept new tile. Provide and install new wall tile (approximately 6" x 6" glazed) from floor to ceiling. o Repair existing drywall ceiling to accept new paint. Paint existing drywall ceiling with 2 coats of paint. Color to be selected by owner. o Provide and install wall mounted urinals with new flush valves, and new toilets with new flush valves. o Provide and install new toilet partitions. Partitions to match existing layout and type. Color to be selected by owner. Provide shop drawings for approval prior to ordering materials. Reinstall existing dispensers and grab bars. o Remove and properly dispose of existing countertop, sinks, and faucets, off corridor that adjoins restrooms. o Mirror on back wall to remain. Soap and paper towel dispensers to remain. o Contractor to provide and install new solid surface countertop with opening for trash can, undermount sinks, faucets, and new p-traps. Provide shop drawings for approval prior to ordering materials. o Remove and properly dispose of existing drinking fountain at entrance to restrooms. Provide and install new electric water cooler with bottle filler. Install new electrical outlet. o Restroom Area 6: o Remove and properly dispose of existing floor tile, countertops, sinks, mirrors, urinals, toilets, toilet partitions, all dispensers, and grab bars. Save dispensers and grab bars for reuse. o Prep floors as required to allow for installation on new floor tile. Provide and install new floor tile (approximately 12" x 24"). Colors to selected by owner. o Prep existing CMU wall to accept new tile. Provide and install new wall tile (approximately 6" x 6" glazed) from floor to ceiling. o Repair existing drywall ceiling to accept new paint. Paint existing drywall ceiling with 2 coats of paint. Color to be selected by owner. o Provide and install new toilet partitions. Partitions to match existing layout and type. Color to be selected by owner. Provide shop drawings for approval prior to ordering materials. o Provide and install wall mounted urinals with new flush valves, new toilets with new flush valves, and new countertops with undermount sinks, new faucets, and new ptraps. Reinstall existing dispensers and grab bars. o Provide and install new mirrors above sinks. o Restroom Area 7: o Remove and properly dispose of existing floor tile, sinks, mirrors, urinals, toilet partitions, and all dispensers. Save dispensers for reuse. o Prep floors as required to allow for installation on new floor tile. Provide and install new floor tile (approximately 12" x 24"). Colors to selected by owner. o Prep existing wall to accept new tile. Provide and install new wall tile (approximately 6" x 6" glazed) from floor to ceiling. o Repair existing drywall ceiling to accept new paint. Paint existing drywall ceiling with 2 coats of paint. Color to be selected by owner. o Provide and new toilets with new flush valves, and new wall mounted sinks, new faucets and new p-traps. Re-install existing dispensers. o Provide and install new mirrors above sinks. o Restroom Area 8: o Remove and properly dispose of existing floor tile, sinks, mirrors, urinals, toilet partitions, and all dispensers. Save dispensers for reuse. o Prep floors as required to allow for installation on new floor tile. Provide and install new floor tile (approximately 12" x 24"). Colors to selected by owner. o Prep existing wall to accept new tile. Provide and install new wall tile (approximately 6" x 6" glazed) from floor to ceiling. o Repair existing drywall ceiling to accept new paint. Paint existing drywall ceiling with 2 coats of paint. Color to be selected by owner. o Provide and new toilets with new flush valves, and new wall mounted sinks, new faucets and new p-traps. Re-install existing dispensers. o Provide and install new mirrors above sinks. Academy International Elementary School: o Remove and properly dispose of existing countertops, waste receptacle cabinets, sinks and faucets at 3 restroom locations. o Mirror on back wall to remain. o Contractor to provide and install new countertops, waste receptacle cabinets, undermount sinks, p-traps, and faucets. Refer to Attachment G: Pricing Schedule for various options. o Contractor to provide shop drawings for approval prior to ordering materials. o The intent is to make the new countertops and sinks look like those that were installed at ATES in 2019 (countertop wall to wall with front loading waste receptacle cabinet). Refer to photo in Attachment H. Academy Endeavor Elementary School: o Remove and properly dispose of existing countertops, waste receptacle cabinets, sinks and faucets at 3 restroom locations. o Mirror on back wall to remain. o Contractor to provide and install new countertops, waste receptacle cabinets, undermount sinks, p-traps, and faucets. Refer to Attachment G: Pricing Schedule for various options. o Contractor to provide shop drawings for approval prior to ordering materials. o The intent is to make the new countertops and sinks look like those that were installed at ATES in 2019 (countertop wall to wall with front loading waste receptacle cabinet). Refer to photo in Attachment H. Explorer Elementary School: o Remove and properly dispose of existing countertops, waste receptacle cabinets, sinks and faucets at 3 restroom locations. o Mirrors on back wall to remain. o Contractor to provide and install new countertops, waste receptacle cabinets, undermount sinks, p-traps, and faucets. Refer to Attachment G: Pricing Schedule for various options. o Contractor to provide shop drawings for approval prior to ordering materials. o The intent is to make the new countertops and sinks look like those that were installed at ATES in 2019 (countertop wall to wall with front loading waste receptacle cabinet). Refer to photo in Attachment H. Prairie Hills Elementary School: o Remove and properly dispose of existing countertops, waste receptacle cabinets, sinks and faucets at 6 restroom locations o Mirrors on back wall to remain. o Contractor to provide and install new countertops, waste receptacle cabinets, undermount sinks, p-traps, and faucets. Refer to Attachment G: Pricing Schedule for various options. o Contractor to provide shop drawings for approval prior to ordering materials. o The intent is to make the new countertops and sinks look like those that were installed at ATES in 2019 (countertop wall to wall with front loading waste receptacle cabinet). Refer to photo in Attachment H. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Educational
$200,000.00
Public - County
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 23, 2025
November 24, 2025
Multiple Locations, Keystone, CO
Related To This Project
Keystone, CO
Bid Date: Oct 15 2025
Keystone, CO
Bid Date: Nov 06 2025
Keystone, CO
Bid Date: Jan 05 2026
Keystone, CO
Bid Date: Jan 23 2026
Keystone, CO
Bid Date: Nov 05 2025
Keystone, CO
Bid Date: Oct 16 2025
Keystone, CO
Bid Date: Aug 06 2025
Keystone, CO
--
Keystone, CO
Bid Date: Jun 20 2025
Keystone, CO
Bid Date: May 28 2025
Keystone, CO
Bid Date: Nov 07 2024
Keystone, CO
Bid Date: Mar 18 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.