BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work and renovation of a water / sewer project in Pinehurst, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The deadline to ask questions is 5/30/2025 5:00 PM CST GENERAL This contract provides for the rehabilitation of six (6) existing Lift Stations within the City of Pinehurst, Texas. The lift stations are located on 33rd Street, 34th Street, Warbler Street, Broad Street, Del Sasso Street, and Highway 90. SPECIFIC This contract shall include all necessary labor, materials, equipment, tools, inspection, testing, and superintendence required for the complete and operable rehabilitation of the proposed project as shown on the contract plans and specifications. This contract includes, but is not limited to the following: 33rd Street Lift Station Remove and replace existing electrical equipment including service, extend existing air vent, remove and replace guide rails, testing, start up, and all related appurtenances. 34th Street Lift Station Remove and replace existing electrical equipment including service, install new steel platform and stairs, demolish existing CMU generator building, install new platform for generator, testing, start up, and all related appurtenances. Highway 90 Elevate electrical components. Warbler Street Lift Station Remove and dispose of existing wet well, furnish and install new grinder package lift station, remove and replace existing electrical equipment including service, testing, start up, and all related appurtenances. Broad Street Lift Station Remove existing wet well brick riser, extend concrete wet well and construct a new top with hatches, remove and replace existing pumps, construct a new valve vault, remove sludge and debris from wet well, rehabilitate all interior surface of wet well, remove and replace existing electrical equipment including service, install new steel platform and stairs, testing, start up, and all related appurtenances. Del Sasso Street Lift Station Remove and replace existing electrical equipment including service, remove and replace existing 4 suction lines, install new steel rack, remove existing fiberglass valve vault and replace with RC valve vault including hatches, testing, start up, and all related appurtenances. CONDITIONS ALONG THE ROUTES The Contractors attention is called to various physical conditions along the routes as follows. Overhead power lines are located near or within the project site. The Contractor shall notify proper authorities at least 72 hours before construction begins. The Contractor shall take precautions to avoid damage to power lines, foundations, guy wires, and appurtenances. The Contractor shall observe all applicable OSHA and owner requirements while working near the overhead power lines including restriction of height of equipment. Underground utilities exist near or within the project area. During construction the Contractor shall take the necessary precautions to avoid damaging the existing utilities within the limits of the project site. SPECIAL REQUIREMENTS The Contractor shall contact Mr. Gregg May at (409) 313-0965 prior to starting any work within the project site. The Contractor shall restore all project locations to their original condition or better prior to the project completion. Question Deadline 06/03/2025 at 5:00 PM CT online submission.

Award

Water / Sewer

$970,260.00

Public - City

Renovation, Site Work

39

8

2

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
52
Bidding Soon
564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2025

July 9, 2025

Project location map

Multiple Locations, Pinehurst, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.