BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 25, 2025 at 7:00 PM

Updated November 26, 2025

Site work for a water / sewer project in Bainbridge, New York. Completed plans call for site work for a water / sewer project.

The Project consists of providing construction materials, labor, equipment and services for urgent repairs to the Kirby Street water main beneath Newton Creek by boring, installing connections, water service transfers, hydrant replacement, and recovering two valves. Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, as indicated in the Bid Form. Each Bid must be submitted on the prescribed Bid Form and accompanied by Bid security, as prescribed in the Instructions to Bidders. The Successful Bidder will be required to furnish the additional bond(s) prescribed in the Bidding Documents. For information concerning the proposed Work, contact: Jonathan Dilmore Barton & Loguidice, D.P.C. 443 Electronics Parkway Liverpool, NY 13088 315) 457-5200, extension 1527 ( jdilmore@bartonandloguidice.com The Owner's right is reserved to reject all Bids or any Bid not conforming to the intent and purpose of the Bidding Documents. Document Note: The date that the Bidding Documents are downloaded will be considered the Bidder's date of receipt of the Bidding Documents. Partial sets of the Bidding Documents will not be available from the Issuing Office. Question Deadline 06/13/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered The following summary of Work is a general summary of the salient features of the Work to be performed by the General and Trades construction contractors. It does not supersede the requirements of the detailed technical specifications. Trenchless installation of water main beneath Newton Creek by boring, installing connections to existing water mains, associated water service transfers to minimize effects of water aging in dead-end pipes, hydrant replacement, and recovering two valves that were used to cap decommissioned pipe under the creek's flume structure

Bid Results

Water / Sewer

$249,775.00

Public - City

Site Work

19

13

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
243
Active Projects
137
Bidding Soon
1,628
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

Project location map

Kirby St, Bainbridge, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.