Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 5, 2025 at 8:00 PM
Updated August 6, 2025
Demolition, site work, paving and new construction of a civil project in Calvey Township, Missouri. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
**As of August 5th, 2025, the project was awarded to K.J. Unnerstall Construction Co, with an awarded amount of $833,077.50.** The Scope of Work includes removal and replacement of Bridge No. 27600261 on Calvey Creek Road over Brady Creek and provides for excavations, bridge construction, embankments, asphalt pavement, pavement striping, traffic control, fencing and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. Franklin County anticipates issuing notice to proceed in the summer of 2025 Any questions regarding this project must be submitted to: mspalding@cochraneng.com, by 4:00 pm local time on June 24, 2025. No written questions after this date or any verbal questions will be recognized A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. For a contractor to be awarded this project the contractor must have a fully responsive contractor questionnaire on file with the Missouri Highway and Transportation Commission at least 7 days prior to the bid opening date. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the 2024 Missouri Standard Specifications for Highway Construction. The DBE Contract Goal for this project is 6.0%, and DBE firms must be certified by MoDOT to attain credit towards this contract goal. There is no On the Job Trainee goal. The Owner Intends to Award the Contract to the Lowest, Responsive, Responsible Bidder. the Owner Reserves the Right to Reject Any and All Bids, and to Waive Any Irregularities in the Best Interest of the Owner With Modots Consent. MODOT - Calvey Creek Road Bridge Bid Result Option 1 KJU, Inc. $834,409.00 Option 2 KJU, Inc. $833,077.50
Award
Roads / Highways
$833,078.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 1, 2025
September 1, 2025
Calvey Creek Rd, Calvey Township, MO
Related To This Project
Calvey Township, MO
Bid Date: Dec 15 2023
Florissant, MO
Bid Date: Jun 25 2025
Jefferson City, MO
Bid Date: Jul 24 2025
Kansas City, MO
Bid Date: Jun 19 2025
Saint Louis, MO
Bid Date: Jul 01 2025
Kansas City, MO
--
Grain Valley, MO
Bid Date: Jun 24 2025
Morrison, MO
--
Camdenton, MO
Bid Date: Jun 19 2025
Belton, MO
Bid Date: Oct 16 2025
Wildwood, MO
Bid Date: Jun 30 2025
Columbia, MO
Bid Date: Jun 13 2025
Cape Girardeau, MO
Bid Date: Jun 10 2025
Bowling Green, MO
Bid Date: Jun 02 2025
Bloomfield, MO
Bid Date: Jun 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
