Demolition and site work for a military facility in Seaside, California. Completed plans call for the demolition of a military facility; and for site work for a military facility.
**As of July 22,2025, the project was awarded to AMERICAN INTEGRATED RESOURCES, with an awarded amount of $2,585,707.95.** This project includes the work to furnish all labor, services, material, tools, equipment, supplies, transportation, utilities, skills, and all other items and facilities necessary for the completion of the Fort Ord Military Reservation Property Demolition Project Phase 1B. The Work generally consists of decontamination, demolition, removal, and proper disposal of select buildings, structures, parking lots, improvements, utilities, and select vegetation located at: Select portions of the Fire Station lot located at 4400 General Jim Moore Boulevard, south of Lightfighter Drive (440 sq-ft structure, 5,600 sq-ft of asphalt concrete pavement, miscellaneous Portland cement concrete improvements, and associated base materials); The abandoned Fast Food Restaurant and its property located at 4401 General Jim Moore Boulevard and Gigling Road (4,000 sq-ft structure and 56,000 sq-ft asphalt concrete pavement, miscellaneous Portland cement concrete improvements, associated base materials) and onsite utility demolition and removal (water services, sewer laterals, gas service); The parking lot 'A' located at the westerly corner of Gigling Road and Malmedy Road (159,000 sq-ft asphalt concrete pavement, miscellaneous Portland cement concrete improvements, associated base materials) and onsite utility demolition and removal (storm drains and water services); The 'Surplus II' area north of Gigling Road, and between Malmedy Road and Arhem Road (42,000 sq-ft of asphalt concrete pavement, miscellaneous Portland cement concrete improvements, associated base materials), and various utility service removals (water, gas, telecom, sewer, electrical) assumed to be abandoned-in-place previously as part of the previous structure demolition projects; The Chapel and associated parking lot to the west located at the intersection of Malmedy Road and north of Colonel Durham Street (11,000 sq-ft asphalt concrete and 15,000 sq-concrete pavement, miscellaneous Portland cement concrete improvements, associated base materials, 8,000 sq-ft structure) and onsite utility demolition and removal (storm drains, water services, sewer laterals, gas service, electrical service, telecom service); The parking lot 'B' located between Arnhem Road and Parker Flats Cut Off Road to the west and east, and Gigling Road and Colonel Durham Street to the south and north (92,000 sq-ft of asphalt concrete pavement, miscellaneous Portland cement concrete improvements, and associated base materials), and onsite utility demolition and removal (storm drains); and The 'East Parker Flats Cut Off Road Demolition Area" area and including the 6th Ave. Parking Lot, north of Gigling Road, and between Parker Flats Cut Off Road to the west and 6th Avenue to the east (142,000 sq-ft of asphalt concrete pavement, miscellaneous Portland cement concrete improvements, and associated base materials), and various utility service removals (water services and mains, sewer mains and manholes, gas services) assumed to be abandoned-in-place previously as part of previous structure demolition projects. The demolition work shall include removal and disposal of the subject structures in their entirety to include roof structures, exterior walls, interior walls, concrete slabs and foundations, windows, doors, plumbing, mechanical, communications, and electrical systems. The site work includes removal and disposal of asphalt concrete parking lots, concrete, retaining walls, steps, excavation and backfill/fill, disconnection, capping, removal, and disposal of water, wastewater, gas, and electrical utilities, rough grading for mitigating safety concerns and facilitating drainage, and hydroseeding for final soil stabilization. Question Deadline 06/12/2025 Bidders must direct all questions about the meaning or intent of Bidding Documents to Owner in writing no later than the 7th day preceding the date set for the receipt of bids
Award
Military
$2,585,708.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.