BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work for a water / sewer project in Montgomery, Texas. Completed plans call for site work for a water / sewer project.

The project includes construction of utilities to serve a singe family residential subdivision. The deadline to ask questions is 6/11/2025 10:00 AM CST Any review of work in process, or any visit or observation during construction, or any clarification of plans and specifications, by the OWNER or ENGINEER Erosion control structures and erosion control protection shall be provided at all storm sewer inlets, at those locations where construction activities are adjacent to wetland and/or drainage ditches, and at other such points as may be designated by the Owners Representative or shown on the Plans. Proposals must be accompanied by a certified or cashier's check or a bid bond from a surety companyholding a permit in the State of Texas for an amount equal to 5% of the amount bid. The amount of saidcertified or cashier's check or bond will be forfeited to the OWNER and the bank or surety shall be liableto the OWNER for the amount in the event the successful bidder shall fail or refuse to enter into a contractor furnish bonds as hereafter required within ten (10) days after the date of notice of award. If a certifiedor cashier's check is provided, the successful bidder shall deliver, at the ENGINEERS office (IDS EngineeringGroup, 13430 Northwest Freeway, Suite 700, Houston, Texas 77040), the original certified or cashier'scheck within twenty-four (24) hours of the bid opening. The successful bidder must furnish a performance bond and a payment bond on the forms provided, each in the amount of 100% of the Contract price from a surety company licensed by the State of Texas. The OWNER reserves the right to reject any or all bids and to waive informalities or irregularities in bidding. In case of lack of clarity in stating prices, the OWNER reserves the right to consider the most advantageous construction thereof, or reject the bid. A. Installation of Pollution Prevention Measures. B. Construction of sanitary sewer and appurtenances. C. Construction of storm sewer and appurtenances. D. Construction of domestic waterline and appurtenances. E. Testing of constructed facilities F. Site clean up and restoration

Award

Water / Sewer

$241,000.00

Public - County

Site Work

20

11

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
239
Bidding Soon
3,747
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 14, 2025

Project location map

Multiple Locations, Montgomery, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.