Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 14, 2025 at 8:00 PM
Updated July 15, 2025
Site work and paving for a civil project in Lemont Furnace, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.
The proposed work involves the full reconstruction of State Route 119, removal of two signals along State Route 119 a half interchange with new bridge and connector road, full depth widening of shoulders and then a mill and overlay on State Route 1027 (Mount Pleasant Road), a new roundabout at the intersection of Connector Road and Mount Pleasant Road, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 0119, Section 20K, in Fayette County, Bullskin and Upper Tyrone Townships from approximately Station 54+00 at segment 0750 offset 1559 to approximately Station 152+61 at segment 0780 offset 2481 and from approximately Station 54+00 at segment 0751 offset 1363 to approximately Station 152+61 at segment 0781 offset 2422. Project Cost Range: $50,000,000.00 - $59,999,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 6.00% Anticipated NTP: 08/25/2025 Required Completion: 08/31/2029 Prequalification Requirement: Yes State Type of Work: Reconstruction Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT: McClure/Kingview Road Interchange *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Roads / Highways
$60,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
August 25, 2025
Multiple Locations, Lemont Furnace, PA
Related To This Project
Lemont Furnace, PA
Bid Date: Jul 24 2025
Lemont Furnace, PA
Bid Date: Jul 24 2025
Lemont Furnace, PA
Bid Date: Sep 11 2025
Lemont Furnace, PA
Bid Date: Sep 11 2025
Lemont Furnace, PA
Bid Date: Sep 05 2025
Lemont Furnace, PA
Bid Date: Nov 03 2020
Lemont Furnace, PA
Bid Date: Nov 03 2020
Lemont Furnace, PA
Bid Date: Sep 08 2025
Lemont Furnace, PA
Bid Date: Jun 26 2025
Lemont Furnace, PA
Bid Date: May 12 2025
Lemont Furnace, PA
Bid Date: Jul 24 2025
Lemont Furnace, PA
--
Lemont Furnace, PA
--
Lemont Furnace, PA
--
Lemont Furnace, PA
Bid Date: Jun 05 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
