EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 12, 2025 at 8:00 PM

Updated June 13, 2025

Site work and paving for a road / highway in Haddonfield, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Disclaimer: IN ORDER FOR YOUR BID TO BE CONSIDERED A LEGAL BONAFIDE BIDDER ON THE PROJECT, DOCUMENTS MUST BE PURCHASED FROM REMINGTON, VERNICK ENGINEERS DIRECTLY 2025 Road Program Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et. seq., N.J.A.C. 17:27-1 et seq. and other information required as shown in the bid packet. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. No interpretations of the meaning of the drawings, specifications or other contract documents will be made to any bidder orally. Every request for such interpretation should be made in writing, addressed to the Engineer, and to be given consideration, must be received at least ten (10) days prior to the final date fixed for receiving bids. Description The "2025 Road Improvement Program" consists of the improvements to the following roads: Gill Road (from Warwick Road to West Atlantic Avenue) Belmont Avenue (from Potter Street to Roberts Avenue) Oak Avenue (from Chews Landing Road to Pomona Avenue) Evergreen Lane (from Glover Avenue to terminus) Lincoln Avenue (from Centre Street to Chestnut Street) Lee Avenue (Intersection with Kings Highway East)ote: The 2025 Road Improvement Program has been prepared with two contracts. The contractor may bid on Contract I, Contract II, or both. However, the Borough of Haddonfield intends to award either Contract I or Contract II, but not both. Contract I (PSO Only): Base Bid Gill Road Belmont Avenue Evergreen Lane Alternate Bid No. 1 Oak Avenue Alternate Bid No. 2 Lincoln Avenue Alternate Bid No. 3 Lee Avenue

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

38

14

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Site Improvements, Retaining Walls, Planting

Find More Local Projects

Within 75 Miles of This Project
343
Active Projects
191
Bidding Soon
3,815
All Active Projects
1,712
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 12, 2025

July 14, 2025

img_map_placeholder

Multiple Locations, Haddonfield, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.