Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 11, 2025 at 8:00 PM
Updated September 12, 2025
Site work for a civil project in Orlando, Florida. Completed plans call for site work for a bridge / tunnel; and water / sewer project.
**As of September 11, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The question period has been opened until July 11, 2025, by 5:00 pm. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, June 16, 2025 at 5:00 pm EST. Orange County, Florida, henceforth referred to as the County is accepting sealed bids for Lakeside Drive Over Lake Rowena/Lake Sue Pipe Culvert Repair (Y25-780) The Estimated Cost for this project is $542,672.13. It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. The County shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties. The question and answer module of OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, June 16, 2025 at 5:00 pm EST. Respondents are instructed not to contact the initiating division directly. Consideration for modification or alteration of the documents contained in this solicitation shall be requested during the specified question period, before the applicable deadline. No oral interpretation of the meaning of the plans, specifications, or other Contract documents shall be considered binding. The County shall be bound by information and statements only when such statements are written and executed under the authority of the Manager, Procurement Division. This provision exists solely for the convenience and administrative efficiency of Orange County. No respondent or other third party gains any rights by virtue of this provision or the application thereof, nor shall any respondent or third party have any standing to sue or cause of action arising there from. Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email corie.cummings@ocfl.net. Critical clarifications may be made via addenda, however, untimely questions may not be considered. The scope of work involves the structural rehabilitation of an existing 120 ft. diameter corrugated metal pipe using a centrifugally cast concrete pipe coating system. The work will be performed within the existing Orange County right-of-way. The Contractor shall provide the following information to all subcontractors and suppliers: County's Representatives The Project Owner shall be Orange County, Florida. The Board shall be represented by the Project Manager listed below during the construction period: Manager, Road and Drainage Division, or designee 4200 South John Young Parkway, Orlando, Florida 32839. Question Deadline 06/16/2025 at 5:00 PM ET
Bid Results
Bridges / Tunnels
$395,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2025
August 28, 2025
Lakeside Dr, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Jun 10 2025
Orlando, FL
Bid Date: Jul 01 2025
Orlando, FL
Bid Date: Jun 18 2025
Orlando, FL
Bid Date: Jun 19 2025
Orlando, FL
Bid Date: Jun 24 2025
Orlando, FL
Bid Date: Jun 03 2025
Orlando, FL
--
Orlando, FL
Bid Date: Jun 03 2025
Orlando, FL
Bid Date: May 30 2025
Orlando, FL
Bid Date: Sep 18 2025
Orlando, FL
--
Orlando, FL
Bid Date: Jun 18 2025
Orlando, FL
Bid Date: Jun 24 2025
Orlando, FL
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
