BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 5, 2025 at 8:00 PM

Updated September 6, 2025

Demolition, site work, paving and new construction of a transportation facility in Joplin, Missouri. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.

**As of September 5th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Questions regarding bids shall be directed to Dave Nauman, Crawford, Murphy & Tilly, Inc. at (314) 571- 9056 or email at dnauman@cmtengr.com. AWARD OF CONTRACT All proposals submitted according to the instructions presented herein will be subject to evaluation. The owner may hold bids for the purpose of conducting an evaluation for a period not exceeding one hundred and twenty (120) calendar days from the date of the bid opening. BASE BID: REPLACE GATE 1 PASSENGER BOARDING BRIDGE & REMOVE GATES 1 & 2 PASSENGER BOARDING BRIDGES ALTERNATE BID ITEM NO. 1: REPLACE GATE 2 PASSENGER BOARDING BRIDGE Prospective bidders are advised; the award of the contract is contingent upon Owner approval and receipt of a federal grant from the Federal Aviation Administration. FEDERAL PROVISIONS The Contractor must comply with the wage, labor requirements, and pay prevailing wages per the schedule of wage rates established by the United States Department of Labor and the State of Missouri and comply with the federal provisions including DBE requirements presented in the following document: Procurement and Contracting Under AIP. Base bid should range from 1.3 to 1.8 million and the alternate bid item should range from 1.0 to 1.5 million. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The rehabilitation of Runway 13-31 may still be under construction in 2025 as well ) Email questions (dnauman@cmtengr.com) due by the close of business on Monday June 30

Bid Results

Transportation Terminals

$1,898,000.00

Public - City

Demolition, New Construction, Paving, Site Work

30

10

7

6

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
74
Bidding Soon
824
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

September 8, 2025

Project location map

7331 State Hwy 43, Joplin, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.