BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2025 at 8:00 PM

Updated August 15, 2025

Renovation of a library in Bel Air, Maryland. Completed plans call for the renovation of a library.

**As of August 11, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** A. The Engineered Drawings and Specifications found in the link below. Hard copies will not be provided. B. The Campus will be in operation during the construction period. The selected firm shall provide traffic control at all times and insure a safe working environment. Project sites shall be kept clean, neat and organized. All work sites shall be enclosed in orange plastic safety fence.It is the Contractor's responsibility for removal and replacement of signs to facilitate work. Restoration of any damage to the College's property (buildings/grounds) will be the Contractor's responsibility. C. Mobilization, set up of contractor equipment, parking, dumpsters etc. shall be coordinated with the College's representative at the pre-construction meeting. D. The Contractor shall a. Provide a 24-hour emergency contact phonenumber. b. Provide a project schedule at the pre-constructionmeeting. c. A qualified, English-language speaking superintendent on the project premises at all times. Any change in supervision shall be communicated to the College's Project Manager immediately. d. Attend progress meetings during the course of theproject. e. Any RFI's or issues shall immediately be brought to the attention of the College's Project Manager. E. Requirements in the specifications related to manufacturer, contractor, subcontractor, or personnel qualifications and/or certifications must be submitted to the Engineering firm at the submittal phase. The Engineering firm has sole authority to accept or reject information provided. If the submitted information is rejected by the Engineering firm, it is incumbent upon the Contractor for fulfill the obligations of the requirements with no increase in cost to the Contract. QUESTIONS DUE DATE & TIME: June 18, 2025 1:00PM Local Time Questions must be received by the due date and time via email to the Procurement Agent listed below PROCUREMENT AGENT: Dave Pyle, CPPB DPyle@harford.edu BID DEPOSIT: 5% of total bid price BONDING REQUIREMENTS: Payment and Performance Bond: 100% of bid price INSURANCE REQUIREMENTS: Construction with Installation Floater PREVAILING WAGE: No

Award

Library

$396,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
630
Active Projects
226
Bidding Soon
4,298
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 7, 2025

Project location map

401 Thomas Run Rd, Bel Air, MD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.