Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 12, 2025 at 8:00 PM
Updated June 25, 2025
Site work and paving for a road / highway in Miles City, Montana. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Purpose of removing and replacing concrete and the doing of all other necessary and incidental to the performance of said work. Bid security in the amount of ten percent (10%) of the bid must accompany each bid in accordance with the Instructions to Bidders. The Contractor shall comply with all fair labor practices and the state statues. No bidder may withdraw his bid for at least 45 days after the scheduled time for receipt of bids. Bid security shall be made payable to the CITY OF MILES CITY in an amount of not less than ten percent of the Bidders Maximum bid price for each Bid schedule and in the form of one of the Following: (1) lawful monies of the United States, (2) a cashiers check, certified check, bank money order, or bank draft drawn and issued by a national banking association located in the State of Montana, or by any banking corporation incorporated under the laws of the State of Montana, or (3) a bid bond or bonds executed by the surety corporation authorized to do business in the State of Montana. The Bid Security of the Successful Bidder will be retained until such Bidder has executed the Agreement, whereupon the Successful Bidder will be required to furnish Owner a contract. If the Successful Bidder fails to execute and deliver the Agreement within 15 days of the Notice of Award, OWNER may annul the Notice of Award and the Bid Security of that Bidder will be forfeited.Award may then be made to the next lowest responsible and qualified bidder or may be re-advertised, as the OWNER may decide. The Bid Security of any Bidder whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the Seventh day after the "effective date of the Agreement" or the forty-first day after the Bid opening whichever occurs first. Bid Security of other Bidders will be returned within fourteen days of the Bid opening. After contract is awarded, the successful bidder will be required to furnish a performance bond in the amount of one hundred percent (100%) of the contract The City reserves the right to waive informalities which are not inconsistent with law and to reject any or all bids. Bids must be on the forms and according to the bid instructions provided by the City. Bids cannot be withdrawn for 45 days after the actual date of the opening. The City also reserves the right to negotiate with the lowest responsible bidder in the event all bids exceed the project budget and to award a negotiated contract to the lowest responsive bidder without further competitive bidding. All bidders shall abide by State and Federal laws pertaining to wage rates and insurance requirements. MAINTENANCE DISTRICT #204 6" CONCRETE DEMO AND REPAVE for MD 204: 1. Removal of Concrete located on the 800 block of Main Street between main and Pleasant and N. 8th and N. 9th Streets. 2. Replacement of 300'x22'x6" of Concrete located at property as described above. 3. Refer to Specifications for more details.
Post-Bid
Roads / Highways
$10,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 24, 2025
July 24, 2025
Multiple Locations, Miles City, MT
Related To This Project
Miles City, MT
Bid Date: Aug 05 2025
Miles City, MT
Bid Date: Jun 17 2025
Miles City, MT
Bid Date: Jun 27 2025
Miles City, MT
--
Miles City, MT
Bid Date: Aug 22 2025
Miles City, MT
--
Miles City, MT
Bid Date: Nov 10 2025
Miles City, MT
--
Miles City, MT
Bid Date: Jun 18 2025
Miles City, MT
Bid Date: Jun 12 2025
Miles City, MT
Bid Date: Jun 18 2025
Miles City, MT
Bid Date: Jun 10 2025
Miles City, MT
Bid Date: Jun 05 2025
Miles City, MT
Bid Date: May 20 2025
Miles City, MT
Bid Date: Apr 16 2025
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
