BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work and paving for a road / highway in Morristown, Tennessee. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of July 31, 2025, the project was awarded to Summers Taylor, with an awarded amount of $4,560,642.50. The project is located along East Morris Boulevard from US-25E (Davy Crockett Parkway) to East of Jones Franklin Road. The project involves resurfacing, addition of turn lanes at various intersections, and installation of two traffic signals. The City is an equal opportunity affirmative action employer, drug-free with policies of non-discrimination on the basis of race, sex, religion, color, national or ethnic origin, age, disability or military service. The City's telephone number is 423-585-4617. The City hereby notifies all bidders that a 3% Disadvantaged Business Enterprise (DBE) goal has been set for this project and must be met or exceeded. A Prime Contractor must prequalify with the Department of Transportation in accordance with Section 54-5-117 of the "Tennessee Code Annotated" and Tennessee Department of Transportation Rule 1680-5-3 prequalification of contractors before biddable proposals will be furnished.

Award

Roads / Highways

$4,560,643.00

Public - City

Paving, Site Work

98

5

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
0
Bidding Soon
584
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

August 25, 2025

Project location map

To Be Determined, Morristown, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.