Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated July 10, 2025
Renovation of a mixed-use development in Exton, Pennsylvania. Completed plans call for the renovation of a educational facility.
Contractor will provide all necessary labor, materials and equipment to perform the following: 1. Supply and install one (1) mobile classroom unit, not to be smaller than 28' x 72' containing two (2) classroom spaces and two (2) restroom spaces. 2. The unit shall be equipped with adequate heating and cooling systems to maintain comfortable and acceptable indoor temperatures throughout all seasons. 3. Delivery of building from contractor's location to our building site located at 515 James Hance Court, Exton, PA. 4. Block and level of building unit on abs pads. 5. Anchor building unit into the ground. 6. Skirting around building unit; material and installation. 7. One (1) ADA compliant ramp and two (2) steps included for entryways. Project start date: ASAP upon contract acceptance; must be completed no later than Wednesday, August 6, 2025 Question Deadline 06/06/2025 at 12:00 PM ET Online Portal Collegium Charter School reserves the right to reject any and all bids and to accept the bid which is in the best interest of Collegium Charter School.
Award
Educational
$136,322.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 13, 2025
July 14, 2025
515 James Hance Ct, Exton, PA
Related To This Project
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jul 02 2025
Exton, PA
Bid Date: Aug 18 2025
Exton, PA
Bid Date: Sep 05 2025
Exton, PA
Bid Date: Nov 04 2025
Exton, PA
Bid Date: Jun 13 2025
Exton, PA
Bid Date: Jul 01 2025
Exton, PA
Bid Date: Jun 17 2025
Exton, PA
--
Exton, PA
--
Exton, PA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
