BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Renovation of a mixed-use development in Exton, Pennsylvania. Completed plans call for the renovation of a educational facility.

Contractor will provide all necessary labor, materials and equipment to perform the following: 1. Supply and install one (1) mobile classroom unit, not to be smaller than 28' x 72' containing two (2) classroom spaces and two (2) restroom spaces. 2. The unit shall be equipped with adequate heating and cooling systems to maintain comfortable and acceptable indoor temperatures throughout all seasons. 3. Delivery of building from contractor's location to our building site located at 515 James Hance Court, Exton, PA. 4. Block and level of building unit on abs pads. 5. Anchor building unit into the ground. 6. Skirting around building unit; material and installation. 7. One (1) ADA compliant ramp and two (2) steps included for entryways. Project start date: ASAP upon contract acceptance; must be completed no later than Wednesday, August 6, 2025 Question Deadline 06/06/2025 at 12:00 PM ET Online Portal Collegium Charter School reserves the right to reject any and all bids and to accept the bid which is in the best interest of Collegium Charter School.

Award

Educational

$136,322.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
782
Active Projects
345
Bidding Soon
4,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 14, 2025

Project location map

515 James Hance Ct, Exton, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.