BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 9, 2025 at 8:00 PM

Updated July 10, 2025

Renovation of a mixed-use development in Exton, Pennsylvania. Completed plans call for the renovation of a educational facility.

Question Deadline 06/10/2025 at 12:00 PM ET Questions through Online Portal New Door Operator and Power Unit - 535 Building Elevator Contractor will provide all necessary labor, materials and equipment to perform the following: Install a new, non-propriety GAL MOVFR closed-loop door operator. o The equipment will consist of a motor with heavy duty sprocket, chain, belt and sheaves. o This operator will regulate speed via motor performance feedback and automatically adjust for external conditions including debris in the track. Replace the power motor with new, upgraded equipment. Scope of work will include: Remove old and original style door operator Build steel supports for new door operator Install new GAL MOVFR closed-loop door operator Replace the door rollers that are bad Adjust torque on new door operator Adjust and ensure optimal door operation Drain the oil on the existing power unit Remove the old power unit Install new power unit Mount the controller Make the proper connections and wire the new power unit in Install new soft start Fill hydraulic tank with oil Adjust valve for proper operation Test and return unit to service Test operation and return car to service All materials and workmanship should have a minimum of a one (1) year guarantee; unless damage is due to equipment exposure to water or other weather-related conditions. The Pennsylvania Prevailing Wage Act (PA PWA) requires that contractors and subcontractors on public works projects in Pennsylvania pay their workers at least the prevailing wage rates for their respective crafts or classifications. Collegium Charter School is publicly funded and therefore falls under the Pennsylvania Prevailing Wage Act. Contract Terms: 25% deposit upon contract acceptance. Net 30 days after project completion. Collegium Charter School reserves the right to reject any and all bids and to accept the bid which is in the best interest of Collegium Charter School.

Award

Educational

$41,795.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
852
Active Projects
387
Bidding Soon
4,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2025

July 14, 2025

Project location map

456 Creamery Way, Exton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.