BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 3, 2025 at 8:00 PM

Updated June 4, 2025

Site work and paving for a civil project in Morton, Illinois. Working plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and water / sewer project.

THIS IS NOT A SOLICITATION. This synopsis is a NOTICE OF INTENT to award a BPA Call from an established BPA for Region 9 Road and does not constitute a request for quotes or submission of any information in response to this notification. Only contractors with an active BPA for the respective zone will be eligible for this call order. The USDA Forest Service (FS), Procurement & Property Services (PPS) is issuing this synopsis as a means of complying with the USDA's policy in the Contracting Desk Book, section 413.303 Simplified Acquisition Methods - Blanket Purchase Agreements (BPAs). BPA calls over $25,000 require synopsis to the government point of entry, even if a synopsis was done at the BPA level. Exemption at FAR 5.202(a)(11) does not apply. The USDA FS intends on awarding a BPA Call for Culvert Replacement for the Midewin National Tallgrass Prairie. This procurement is restricted to the approved eligible companies.This requirement will be awarded as a BPA Call against the Region 9 Road Blanket Purchase Agreements previously solicited on the Government Point of Entry (GPE) at https://sam.gov/content/home. The government will not provide feedback or evaluations to companies regarding their submissions in response to this notice. Work includes but is not limited to: This project is comprised of all required labor, equipment, and materials necessary to perform the following work: Excavate and remove two 34-inch diameter, 38-foot-long corrugated metal pipes (CMPs) buried side by side in the existing roadway, installing a new CMPA arch, laying a layer of stones to protect the new water channel, and repairing the road crossing. Excavating and removing single 18-inch diameter, 19-foot-long corrugated metal pipe (CMP) buried in the existing roadway 60' north of the first pipe, installing a new CMPA arch, laying a layer of stones to protect the new water channel, and repairing the road crossing. THIS IS NOT A SOLICITATION. The Method of Contractor Selection has not been determined at this Time.

Final Planning

Roads / Highways

$200,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
77
Bidding Soon
1,266
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

Project location map

To Be Determined, Morton, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.