BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 16, 2025 at 8:00 PM

Updated September 17, 2025

Demolition, site work and addition to a transportation facility in Midland, Texas. Completed plans call for the addition of a 37,229-square-foot transportation facility; and for site work for a transportation facility.

https://www.beaumontenterprise.com/news/article/midland-city-council-preview-21014895.php Aug 25, 2025 Airport Renovations: Two major airport renovation grants from the Federal Aviation Administration are set to be reviewed, paving the way for the terminal update at Midland Airport to begin. The first grant totals $8 million, and the second totals over $10.2 million. _______________________________________________________________ https://www.mrt.com/news/article/midland-city-council-preview-20812359.php The second, Décor IQ Inc., will be evaluated to install decorative lighting in the main terminal. The third, Parkhill, Smith & Cooper, will be evaluated to execute a 2021 runway asphalt pavement plan. ---------------------------- Goals for minority participation for each trade: 19.1% Goals for female participation in each trade: 6.9% Principal items of Work are set forth in specific detail in the Proposal Section of these Specifications; however, Work items may be generally described as expansion of Terminal Building for new passenger checkpoint and modernization of existing Terminal Building. Work will also include other miscellaneous materials, equipment, machinery, superintendence, and labor for constructing these improvements for the Midland International Air & Space Port, Midland, Texas. A Bid Proposal guaranty is to accompany the Bid, thereby guaranteeing the good faith of the Bidder and that Bidder will enter into the written contract. The guaranty is to amount to 5 percent of the total bid and must be in the form of cash or certified check, issued by a bank satisfactory to the City of Midland, or a bid bond. DBE contract goal of 2.93 percent has been established for this contract. Bidder/Oeror shall make good faith eorts, as defined in Appendix A, 49 CFR Part 26, to meet contract goal for DBE participation in performance of this contract. Successful Bidder/Oeror will be required to submit the following information: (1) names and addresses of DBE firms that will participate in contract; (2) description of work each DBE firm will perform; (3) dollar amount of participation of each DBE firm participating; (4) written documentation of bidder/oeror's commitment to use a DBE subcontractor whose participation submits to meet contract goal; (5) written confirmation from the DBE of participation in contract as provided in commitment made under (4); and (6) if contract goal is not met, evidence of good faith eorts. Successful Bidder or Oeror must provide written confirmation of participation from each DBE firm the Bidder or Oeror lists in their commitment. This Bidder/Oeror must submit DBE written confirmation of participation within five days of receiving Owner notice to successful Bidder.

Award

Transportation Terminals

$38,577,000.00

Public - City

Addition, Demolition, Site Work

160

25

67

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
12
Bidding Soon
220
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 8, 2025

Project location map

9506 La Force Blvd, Midland, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.