BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Site work for a water / sewer project in Redford, Michigan. Completed plans call for site work for a water / sewer project.

Replacement of approximately 5.5 miles of water main along various streets by pipe bursting. Related gate valves, hydrants, and fittings will be open cut. Directional drilling will occur beneath Joy Rd, Wadsworth St, Farley St, and the DPS Service Dr. Attention is called to the Project being funded by the State Revolving Fund and must adhere to the requirements for non-equivalency projects. Bidders should note the requirements from EGLE included in this project and shall abide by the Federal Wage Rate Determination which is referred to or contained in the Project Manual. Bidders must download the Documents from online to be included on the Plan Holders List and to receive any Addenda posted for the project. Any questions regarding the Request for Proposal will be directed to Kelly McRobb-Ackland, Project Engineer at kackland@wadetrim.com. Questions will be received until June 19, 2025 at 5:00 PM. The Work will be substantially completed on or before 10-21-2027, and completed and ready for final payment in accordance with paragraph 14.11 of Section 00 72 00 - General Conditions on or before 11- 20-2027. Question Deadline 06/19/2025 at 5:00 PM ET

Award

Water / Sewer

$9,357,557.00

Public - City

Site Work

96

13

16

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
535
Active Projects
313
Bidding Soon
2,635
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2025

October 27, 2025

Project location map

Multiple Locations, Redford, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.